Loading...
HomeMy WebLinkAbout~Master - Change Order for Power Plant Oil Ignitor System Study RESOLUTION NO. 11-309 RESOLUTION APPROVING CONTRACT CHANGE ORDER FOR POWER PLANT OIL IGNITOR SYSTEM STUDY FOR THE CITY OF AMES, IOWA WHEREAS,this project provides for engineering services to improve the Ignitor Oil System for long-term effective and safe operation, and this system has been difficult to operate and is unreliable with frequent mis-firings and flame-outs; and, WHEREAS, unreliability causes delays to start-up and leads to lost opportunities in the power market or results in the need to purchase power at a cost higher than plant production cost; and, WHEREAS, on August 24, 2010, the Council a warded a contract to Burns &McDonnell for the Power Plant Ignitor Oil Study in a not-to-exceed amount of$31,023.00; and, WHEREAS, the scope of Change Order No. 1 is to have Burns & McDonnell review the system on Boiler No.7 and determine modifications for the future installation of Class 1 ignitors that are currently the industry standard; and, WHEREAS, engineering tasks and other operational problems required for this study have been identified; and, WHEREAS, Change Order No. 1 is in the amount of$22,500,bringing the project total to $53,523.00; and, WHEREAS,the approved 2010/11 CIP includes$100,000 for the engineering portion of the project. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that Change Order No. 1 with Burns &McDonnell in an amount not to exceed$22,500.00 for the scop of work increase to the Power Plant Ignitor Oil Study is hereby approved. ADOPTED THIS 28`h day of June, 2011. Diane R. Voss, City Clerk Ann H. Campbell, Mayor Introduced by: Mahayni Seconded by: Davis Voting aye: Davis, Goodman,Mahayni, Larson, Orazem, Wacha Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 28`h day of June, 2011.