HomeMy WebLinkAbout~Master - Agreement for Phase II-Design of WPC Plant SCADA Upgrade RESOLUTION NO. 10-023
RESOLUTION APPROVING ENGINEERING SERVICES AGREEMENT FOR
DESIGN OF WPC PLANT SCADA UPGRADE-PHASE II
FOR THE CITY OF AMES
WHEREAS,in 2004,Kaeding and Associates,Inc.,worked with City staff to identify a comprehensive,
long-term solution to the information and control needs of the Water Pollution Control(WPC)Plant; and,
WHEREAS,in September 2004,the Council received the written report that was the result of this study,
and that report recommended replacing the existing proprietary system with a new programmable logic controller-
(PLC)based system similar to the one installed at the City's Water Plant; and,
WHEREAS, this replacement became Phase I of the larger WPC Plant Supervisory Control and Data
Acquisition (SCADA) project, and the new system preserved all the capabilities of the previous system while
allowing much greater flexibility to control individual treatment processes and equipment; and,
WHEREAS,the PLC-based system is more generic,thus,on-going repair,maintenance,and support will
be less expensive and more available; and,
WHEREAS, Phase 11 of the SCADA project will include replacement and expansion of field control
elements;and,
WHEREAS, during Phase I, Kaeding and Associates, Inc.,merged with Barr Engineering, Inc., and the
project manager for Barr Engineering is the same engineer who staff worked with on a number of controls projects
for both the WPC Plant and the Water Plant; and,
WHEREAS,now that detailed design work is ready to begin for the WPC Plant SCADA Phase 11 upgrade,
staff believes continuing to work with Barr Engineering will allow continuity with the design,as well as provide a
more standardized SCADA architecture between the Water Plant and the WPC Plant; and,
WHEREAS, for these reasons, staff requests authorization to waive the purchasing policy that requires
competitive proposals for procurement of professional services costing more than$25,000; and,
WHEREAS,Barr Engineering has provided a proposal for design and bidding services for Phase II of this
project in the amount of$47,205,plus reimbursables estimated at$3,500.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that the
engineering services agreement with Barr Engineering,Inc.,ofMinneapolis,Minnesota,in an amount not to exceed
$50,705 for Phase 11 design and bidding services for the Water and Pollution Control Plant SCADA upgrade is
hereby approved.
ADOPTED THIS 26'day of January,2010.
Diane R. Voss, City Clerk Ann H. Campbell, Mayor
Introduced by: Mahayni
Seconded by: Orazem
Voting aye: Davis,Goodman,Larson,Mahayni,Orazem,Wacha
Voting nay: None Absent: None
Resolution declared adopted and signed by the Mayor this 26'day of January,2010.