Loading...
HomeMy WebLinkAbout~Master - Contract for Library Expansion Feasibility Study RESOLUTION NO. 09-053 RESOLUTION APPROVING CONTRACT FOR LIBRARY EXPANSION FEASIBILITY STUDY FOR THE CITY OF AMES WHEREAS,in December 2007,the Ames Public Library Board of Trustees accepted a study by Library Planning Associates,which found that,based on current and projected library activities, a library facility of 94,000 square feet would meet basic needs of the Ames community, and the current library is a 48,000 square-foot facility; and, WHEREAS,a Request for Proposals(RFP)to contract with an architectural firm to perform a feasibility study for the expansion of the Ames Public Library was sent to several regional architects; and, WHEREAS, sixteen firms responded to the RFP, and an evaluation team selected the proposal of Meyer, Scherer, &Rockcastle, LTD, of Minneapolis, Minnesota; and, WHEREAS,the contract requires recommendations for site location,a schematic design,cost estimation, and materials; and, WHEREAS, the design development calculation is based on a not to exceed amount of $282,000; and, WHEREAS,the contract further requires that the architect conduct no less than three public forums to gather input into the siting and design of the expanded facility, specifies a not to exceed amount of$24,000 for reimbursable expenses, and an allowance of up to $10,000 for printing, postage, and presentation materials; and, WHEREAS, the total not to exceed amount is $306,000. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that the contract with Meyer,Scherer,&Rockcastle,LTD,of Minneapolis,Minnesota,in an amount not to exceed$306,000 for the Library Expansion Feasibility Study is hereby approved. ADOPTED THIS I Oth day of February, 2009. Diane R. Voss, City Clerk Ann H. Campbell, Mayor Introduced by: Mahayni Seconded by: Goodman Voting aye: Goodman, Larson, Mahayni, Popken, Rice Voting nay: None Absent: Doll Resolution declared adopted and signed by the Mayor this 10'day of February, 2009.