HomeMy WebLinkAbout~Master - Major Site Development Plan for The Shops at East Prairie Lifestyle Center RESOLUTION NO. 07-484
RESOLUTION APPROVING MAJOR SITE DEVELOPMENT PLAN
FOR THE SHOPS AT EAST PRAIRIE LIFESTYLE CENTER
FOR THE CITY OF AMES
WHEREAS,the proposed Major Site Development Plan is consistent with the Land Use Policy
Plan (LUPP) Map designation, which is "Regional Commercial;" and,
WHEREAS, the Council has approved a zoning designation of "PRC" (Planned Regional
Commercial)with an"O-GNE"(Northeast Gateway Overlay District)designation and directed that this
zoning take effect when the developer purchases the property, and,
WHEREAS,the proposed Major Site Development Plan is consistent with the PRC and O-GNE
zoning designations,therefore,any approval of the Major Site Development Plan should be conditional
upon the PRC and O-GNE zoning designations taking effect; and,
WHEREAS,the Council approved the Master Plan for the development of all property within
the Northeast Gateway Overlay District on December 19,2006,and this Plan is conceptual and sets how
the overall development will meet the design standards of the City's Zoning Ordinance; and,
WHEREAS, the Major Site Development Plan is to contain the design detail needed to
understand how the Master Plan will be carried out on each property, and,
WHEREAS,the Major Site Development Plan under consideration includes all of the property
within the "ring road" of the Lifestyle Center, the required marsh buffer in Outlot A, the stormwater
features in Outlots B and C and the entry roads (Lots C, D, F, and H); and,
WHEREAS,the major anchor stores on Lots 2 and 4 are not included at this time,and there will
be future Major Site Development Plans for each of these lots; and,
WHEREAS,approval of the Major Site Development Plan by the City Council is required prior
to the issuance of a Building/Zoning Permit for development on any lot, tract, or parcel of land in the
"O-GNE" District, and it must comply with the City's general development standards, as well as
development standards for the Planned Regional Commercial District and the Northeast Gateway
Overlay District; and,
WHEREAS,in order to assure that the Lifestyle Center will be consistent with the intent of all
City zoning regulations, the following conditions should be met before staff certifies approval of the
Major Site Development Plan:
1. The PRC and O-GNE zoning designations must take legal effect.
2. The Final Plat must be recorded with Story County.
3. The orientation or dimensioning of handicap parking spaces on the Major Site Development
Plan must be changed to provide an eight-foot wide striped area on the passenger side of all
parking spaces that are designated as van accessible.
4. On the Plan, easements must be shown for all public storm sewers (except building drainage
lines), sanitary sewer main and water mains,and the plans must indicate that all public utilities
must be constructed to Urban Standards Specifications for Public Improvements.
5. City staff shall review and approve an updated stormwater management plan.
6. The locations shown on the landscaping plans and the traffic signage plan for the speed tables
shall be coordinated. (Locations can be selected at the developer's discretion.)
7. Drainage easements shall be shown on the Major Site Development Plan for all stormwater
detention ponds.
8. A discharge pipe for the bioswale in the northwest corner of the parking lots must be shown on
the Major Site Development Plan, or infiltration rates must be provided in the stormwater
management plan indicating that there will be no standing water that would require a discharge
pipe.
9. On the Major Site Development Plan, specific material types and material locations shall be
shown that meet the building design standard for accent materials.
10. On the Plan, the architectural variations referenced by Section 29.1109(14)(h) shall be shown
on two facades that face Interstate 35—the west facade of Building 200 and the west facade of
Building 900.
11. On the Plan,higher light levels at the pedestrian crossings within the Lifestyle Center Shopping
Street shall be provided;
and,
WHEREAS, after staff certifies approval of the Major Site Development Plan, the following
conditions must be met: 1) the comments on the Construction SWPPP Review Checklist shall be
followed before the Grading and Stormwater Permit will be issued; 2) the mechanical rooms for
Building 900 and for the two Major Anchor Stores must be shown on the future building plans before
building permits will be issued; and, 3)Post Indicator Valves shall be installed in locations approved
by the Fire Department as the fire supply water lines are installed during construction; and,
WHEREAS,the Planning and Zoning Commission unanimously recommended approval of the
Major Site Development Plan with the aforementioned conditions.
NOW,THEREFORE,BE IT RESOLVED by the City Council of the City of Ames,Iowa, that
the Major Site Development Plan for the proposed Lifestyle Center in the"O-GNE"District is hereby
approved, subject to the aforementioned conditions being met.
ADOPTED THIS 23rd day of October, 2007.
C�A�?. LX,4..A" A. 'Pol. e---,A4aJ
Diane R. Voss, City Clerk Ann H. Campbell, May
Introduced by: Goodman
Seconded by: Larson
Voting aye: Doll, Goodman, Larson, Mahayni, Popken
Voting nay: Rice Absent: None
Resolution declared adopted and signed by the Mayor this 23rd day of October, 2007.