Loading...
HomeMy WebLinkAbout~Master - Contract for design work on fire suppression measures RESOLUTION NO. 05-343 RESOLUTION APPROVING CONTRACT FOR DESIGN WORK ON FIRE SUPPRESSION MEASURES AT POWER PLANT FOR THE CITY OF AMES WHEREAS, the Capital Improvement Plan (CIP) for the Electric Utility contains a total of $583,000 in 2005/06 for fire protection measures associated with the coal-handling equipment at the Power Plant; and, WHEREAS,as a first step in designing the projects needed to accomplish this work,engineering services must be obtained to study the specific needs of our plant;explore availability of tie-in locations with the current fire system;review NFPA Codes and possible loss potential;and,begin the design work of deluge systems needed for the hoppers and crusher area, as well as the coal transfer house and conveyors; and, WHEREAS,this is design work that the City does not have the staffing capability to handle;and, WHEREAS,in 2003,Brown Engineering prepared the initial plans for fire protection systems for the Plant, Coal Yard, and Cooling Towers, and more recently, the Brown staff has prepared plans and specifications and analyzed the bids for the first phase of the Fire Protection System,the installation of the Diesel Fire Pump and related piping; and, WHEREAS, staff is confident in Brown Engineering's ability to meet the Utility's needs, and bidding out engineering services for Phases 2 and e of this system would cause delays,more involvement of staff time, and result in possibly higher overall costs; and, WHEREAS, Brown Engineering has submitted a proposal of$78,100 for design work and bid administration for this project; and, WHEREAS, staff is requesting that the City Council waive formal bidding procedures and approve a contract with Brown Engineering Company for study,design,and bidding of the Fire Protection System for the Power Plant Pulverizer and Coal-Handling System. NOW,THEREFORE,BE IT RESOLVED by the City Council of the City of Ames, Iowa, that formal bidding procedures are waived and a contract with Brown Engineering Company in the amount of$78,100 for the study,design,and bidding phase of the Fire Protection System for the Electric Utility Power Plant is hereby approved. ADOPTED THIS 9t'day of August,2005. c�? Stg � Diane R. Voss, City Clerk Ted Tedesco, Mayor Introduced by: Goodhue Seconded by: Wirth Voting aye: Cross, Goodhue, Goodman,Mahayni, Vegge,Wirth Voting nay: None Absent: None Resolution declared adopted and signed by the Mayor this 9'day of August,2005.