HomeMy WebLinkAbout~Master - Change Order for engineering services for Combustion Turbine Generator RESOLUTION NO. 05-314
RESOLUTION APPROVING CHANGE ORDER NO. 2 FOR
ENGINEERING SERVICES IN CONNECTION WITH THE
COMBUSTION TURBINE GENERATOR PROJECT
FOR THE CITY OF AMES
WHEREAS, this year's budget includes a CIP project to install a 20 MW Combustion
Turbine Generator at the existing combustion turbine generator site located at Dayton Avenue and
Pullman Street; and,
WHEREAS, the budgeted cost of the project is $16,674,000; and,
WHEREAS,at the October 14,2003,Council meeting,an Engineering Services Agreement
with Sega, Inc., was approved for this project; and,
WHEREAS, as the project progressed, the following extra engineering services were
required: 1) Human-Machine Interface control computer and associated system software upgrade;
2)balance of Plant controller upgrades;3)G.E.turbine generator control interface;4)environmental
permit; 5)extended on-site construction and start-up support;6)additional engineering costs due to
late G.E. interface items; 7) GT 1 controls communication cabinet and Balance of Plant controls;
and, 8)postpone GT 1 controls upgrade from May 2005 to October 2005; and,
WHEREAS,the total amount for Change Order No.2 is$432,009 and will be expended from
the Contingency Fund.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa,
that Change Order No. 2 in the amount of$432,009 to Sega, Inc., for Engineering Services for the
Combustion Turbine Generator Project is hereby approved.
ADOPTED THIS 26th day of July, 2005.
Diane R. Voss, City Clerk Ted Tedesco, Mayor
Introduced by: Goodhue
Seconded by: Goodman
Voting aye: Goodhue, Goodman, Mahayni, Vegge, Wirth
Voting nay: None Absent: Cross
Resolution declared adopted and signed by the Mayor this 26"'day of July, 2005.