HomeMy WebLinkAbout~Master - New and revised fees RESOLUTION NO. 03-159
A RESOLUTION ADOPTING NEW AND REVISED FEES
FOR THE CITY OF AMES IOWA
BE IT RESOLVED by the City Council for the City of Antes,Iowa,that the following fees shall be
adopted or adjusted to recover the approximate actual costs of city services from those who use and
benefit from these services.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Ames, Iowa, that
fees shall be adopted as follows:
SECTION ONE. The following Public Safety-Police Fees arc hereby adopted or adjusted effective
July 1, 2003:
Outside Payback Overtime Rate $35.00/hour
SECTION TWO. The following Fire Department Fees are hereby adopted or adjusted effective July
1, 2003:
Building Permit Fee Schedule
The value to be used in computing the building permit and building plan review fees shall be the total value of all
construction work for which the permit is issued, as well as all finish work, painting,roofing, electrical, plumbing,
heating, air conditioning, elevators, fire-extinguishing systems and any other permanent equipment. The building
permit fee will be 52%of the amounts listed in the table below,however, the minimum building permit fee will be
$25.00.
TOTAI.VALUATION AMOUNT OF FEE
$1.00 to$500.00 $25.00
$501.00 to$2,000.00 $25.00 for the first$500.00,plus$3.05
for each additional$100.00 or fraction
thereof,to and including$2,000.00.
$2,001.00 to$25,000.00 $69.25 for the first$2,000.00 plus$14.00 for
each additional$1,000.00 or fraction thereof,
to and including$25,000.00.
$25,001.00 to$50,000.00 $391.75 for the first$25,000.00 plus$10.10 for
for each additional$1,000.00 or fraction thereof,
to and including$50,000.00.
$50,001.00 to$100,000.00 $643.75 for the first$50,000.00 plus$7.00 for
each additional$1,000.00 or fraction thereof,
to and including$100,000.00.
$100,001.00 to$500,000.00 $993.75 for the first$100,000.00 plus$5.60 for
each additional $1,000.00 or fraction thereof, to and
including$500,000.00.
1
$500,001.00 to$1,000,000.00 $3,233.75 for the first$500,000.00 plus $4.75 for
each additional$1,000.00 or fraction thereof,to
and including$1,000,000.00
$1,000,00 1.00 and up $5,608.75 for the first$1,000,000 plus$3.65
for each additional$1,000.00 or fraction thereof.
Plan Review Fee
The Plan Review Fee shall be sixty-five(65)percent of the Building Permit Fee to cover costs to the city in
reviewing plans for code compliance. Plan Review Fee must be paid prior to plan review. Up to$140.00 will be
kept to cover time spent if project is cancelled. A$70.00 fee to review changes to a reviewed set of plans.
Additional Fees
For each issuance of a Temporary Certificate of Occupancy $40.00
For Administrative Fee to cancel a permit 25.00
Minimum fee to investigate moving a building regardless of whether it is moved or not. 100.00
(If move occurs also must pay actual city expenses)
For all reinspections after the first free one 40.00
To issue a foundation permit prior to issuance of the building permit 40.00
To issue a Certificate of Occupancy for a use change 40.00
Plumbing Permit Fee Schedule
JOB FEE
Basic Fee-(In addition to below fees)
For new construction,additions,or alterations to multi-family,
commercial and industrial 17.00
Basic Fee-(In addition to below fees)
For existing 1 and 2 family dwelling additions and alterations 9.00
Building Sewer,new or renewal 5.50
Water service,new or renewal 5.50
Combined water&sewer, one ditch 7.75
Plumbing fixture,trap or appurtenance 2.20
'(including water,drainage,piping and bacldlow protection therefor)
Building storm sewer 4.45 ea.
Storm sewer opening 3.30 ea.
Reinspection of defective work 40.00
Abandon sewer and water 6.65
Gas piping system, each outlet 3.30
Water heater and/or vent 220
Rainwater systems,per drain(inside building) 2.20
Industrial waste per-treatment interceptor,including its trap and vent,
excepting kitchen type grease interceptors functioning as fixture traps 2.20
Installation,alteration or repair of water piping and/or
water treating equipment 2.20
Repair or alteration of drainage or vent piping 2.20
Lawn sprinkler system on any one meter,including backflow protection
devices therefor 2.20
Vacuum breakers or backflow protective devices on tanks,vats,etc.
or for installation on unprotected plumbing fixtures,including
2
necessary water piping,each 2.20
*Appurtenance shall include any device or appliance requiring water or waste.
The minimum plumbing permit fee is$25.00.
Mechanical Permits
Job Fee
Basic Fee-(In addition to below fees)For new construction,multi-
family,commercial additions and alterations $17.00
Basic Fee-(In addition to below fees)For existing 1 and 2 family
dwelling additions and alterations 9.00
For the installation or relocation of each forced-air or gravity-type 10.00
furnace or burner,including ducts and vents attached to such
appliance,up to and including 100,000 Btu/h
For the installation or relocation of each forced-air or gravity-type 12.20
furnace or burner, including ducts and vents attached to such
appliance over 100,000 Btu/h
For the installation or relocation of each floor furnace,including vent 10.00
For the installation or relocation of each suspended heater, recessed 10.00
wall heater or floor-mounted unit heat
For the installation,relocation or replacement of each appliance vent 5.00
installed
For the installation or relocation of each boiler or compressor to and 10.00
including three horsepower,or each absorption system to and
including 100,000 Btu/h
For each air-handling unit to and including 10,000 cubic feet per 7.20
minute,including ducts attached thereto
For each air-handling unit over 10,000 efm 12.20
For each gas-piping system-each outlet 3.30
Reinspection 40.00
The minimum mechanical permit fee is$25.00.
3
i
Electrical Permit Fee Schedule
Description of Work Fee
Basic Fee-(In addition to below fees)for multi-family,commercial,
industrial,new construction,additions or alterations 17.00
Basic Fee-(In addition to below fees)for existing I and 2 family dwelling additions or
alterations 9.00
a. Minimum fee(all new construction and alterations to other than single
and two-family dwellings)
1) New single family dwelling 65.00
2) Two family dwelling 100.00
3) Multiple family,commercial, industrial, follow schedule
"(include additions or alterations to above)
b. Unit Fee Schedule
I) Meters,each meter 4.60 ea
2) Circuits,each circuit 1.90 ea
3) Openings,includes outlets, switches&receptacles .85 ea
4) Fixed Appliances
a) Range 4.60 ca
b) Dryer 4.60 ea
c) Dishwasher 4.60 ca.
d) Disposal 4.60 ca
e) Furnace 4.60 ea
f) Air Conditioner 4.60 ea
g) Unit Heater 4.60 ca
h) Water Heater 4.60 ea
i) Electric Space Heater 4.60 ea
j) Other 4.60 ea
5) Fixtures .35 ea
6) Motors(exclusive of circuits) 1.65 ea
Reinspection 40.00
The minimum electrical permit fee will be S25.00
Other Inspections and Fees
I. Inspections outside of normal business hours $40.00
2. Reinspection fee 40.00
3. Inspections for which no fee is specifically indicated 40.00
4. Additional plan review required by changes, additions or
revisions to approved plans 75.00
4
SECTION THREE. The following Watcr and Pollution Control Fees are hereby adopted or
adjusted effective July 1, 2003:
Water Division
Bulk Water Service .42/100 gallons
Water Meter Division
Meter&Setting Fees-Disc Style
5/8"or 5/8 "x 3/."disc $ 165.00
%"disc 190.00
1"disc 235.00
1%2"disc 495.00
Meter&Setting Fees-Single Jet Style
Spectrum 50- 1'/2" $945.00
Spectrum 88- 1'/2" 1,045.00
Spectrum 88-2" 1,345.00
Spectrum 130-2" 1,695.00
Spectrum 175-3" 2,990.00
Spectrum 260-3" 3,345.00
Spectrum 260-4" 4,285.00
Spectrum 440-4" 4,990.00
Meter&Setting Fees-Compound Style
2" $ 1,895.00
3-1 2,370.00
4" 3,725.00
Meter&Setting Fees-Turbo Style
2"
$]015.00
311 2,370.00
4"
3,725.00
Meter&Setting Fees-Misc.Meters
Larger than 4"or alternative styles-to be determined when ordered
Hydrant Meter 195.00+$1.80/100 cubic feet
Repair of Frozen/damaged meter 110.00+repairs/replacement
Unauthorized use of water 115.00/occurrence
Unmetered use of water 2.50/day +$10.00
Resetting fee for unauthorized meter removal 110.00
Customer requested meter test fee 70.00
Service or meter disconnect or reconnect fee 40.00/trip
WPC Division
Waste hauler Fee
Domestic Waste 35.00/load+
28.00/100 gallons
(57.00/cubic yard)
Non-Domestic Waste 35.00/load+unit rate to be
determined
Unauthorized Sewer Use 115.00/occurrence
Unmetered sewer use 2.50/day+$10.00
5
SECTION FOUR. The following Building and Development Fees are hereby adopted or
adjusted effective July 1, 2003:
Annexation(Clerk's Office) 65.00
LUPP Map Amendment 150.00 4V0/acre
LUPP Text Change 50.00
Rezoning 150.00
Zoning Ordinance Text Amendment 75.00
PRD Rezoning 175.00 plus$10/acre
PRD Amendment,Major 175.00 plus$I0/acre
PRD Amendment,Minor 85.00
Plats-Preliminary 195.00 plus$5.00/1ot
Plats-Final 195.00
Major Site Development Plan 100.00+$10/acre
Minor Site Development Plan 100.00
Special Use Permits $75.00
Permitted Home Occupation 20.00
Special Home Occupation 75.00
RLP Development Plan 175.00 plus$10/acre
RLP Plan Amendment 100.00
Zoning Compliance Letter 100.00
Adopted this „ 13th day of May , 2003.
Diane R. Voss, City Clerk Ted Tedesco, Mayor
6