Loading...
HomeMy WebLinkAboutA016 - Staff Report dated March 27, 2018 ITEM: 51 Staff Report LINCOLN CORRIDOR REDEVELOPMENT PROJECT UPDATE FOR DOWNTOWN GATEWAY FOCUS AREA March 27, 2018 BACKGROUND: The City has been working for two years to develop, adopt, and implement the Lincoln Way Corridor Plan. The City Council identified the Downtown Gateway Focus Area as the first priority for implementation. The Downtown Gateway area is generally described as the area south of the railroad tracks and bounded by Grand Avenue to the west and Duff Avenue to the east. The City is in the process of reviewing new zoning standards for the area and staff has been in discussion with a variety of private development interests over the past 6 months. City Council specifically referred to staff in September 26, 2017 a request from a developer for staff to engage in a discussion on the feasibility of a redevelopment project on the north side of Lincoln Way between Clark Avenue and Kellogg Avenue. The potential developer for this initial Gateway project is the Argent Group. Argent is about to proceed to acquire a number of properties needed to accomplish their proposed mixed-use redevelopment project. Since this first step requires a sizable investment, the developer would like to determine if there is general support for the concept that is being proposed and a willingness to provide a city financial incentive for the project before moving ahead with this project. It should be noted that the current concept has been refined from the initial project depicted in September. The September concept included a broader development project that included a shared public/private parking structure north of the railroad with a pedestrian bridge connection to the redevelopment project south of the railroad tracks. The current concept, however, now includes properties along Lincoln Way and does not contemplate including construction of a parking garage and bridge north of the railroad,tracks. The current concept includes redevelopment of approximately 4 acres between.Lincoln Way and Gilchrist at the corner of Clark Avenue. (Attachment A-Location Map) The development concept includes a centrally located outdoor courtyard/plaza area bordered by a mixed-use building and a boutique branded hotel. The hotel, residential, and commercial uses would be served by privately owned parking structures. The current Starbucks would be relocated to the Clark Avenue corner as a freestanding establishment. Attachment B includes massing diagrams and schematic building layouts 1 for the project. The following tables summarize the primary uses shown in Attachment B. Mixed Use' B -114i" Ground Floor Retail 17,000 sq. ft Ground level commercial plaza 25,000 sq. ft. with outdoor seating and video screen 2"d Floor Office/Flex space undefined Apartment units/bedrooms 187 Apartments totaling 550 beds Residential Amenity Ground Floor 2,700 sq. ft. Residential Amenity 2" Floor Outdoor pool deck Ground Floor Retail 3,500 sq. ft. Restaurant Bar area undefined Hotel Rooms 106 . ® 41 Freestanding Drive-Through 2,500 sq. ft. Development of the site will include access from Lincoln Way and Gilchrist. The number of driveways along Lincoln Way will be reduced from the current eight to two driveways. Included in this proposal is the reconstruction of Lincoln Way to include parallel parking simliar to street frontages in Campustown. Gilchrist frontage improvements will also occur to help create a more inviting approach to the project and connection to Kellogg Avenue. Since the City owns a water well that is situated on the site of the proposed Mixed Use building, the developer will need to acquire the property and provide compensation for replacement of the well capacity as part of the redeveloment project. STAFF COMMENTS: The proposed development concept includes many elements identified within the Corridor Plan as important for the area. The project includes design features intended to make it a destination commercial area with the central plaza lined with commercial uses, a boutique hotel to diversify lodging options in the City and promote visitors to Downtown, frontage improvements to Lincoln Way, and new high amenity millennial housing apartments. In addition, the scale and elements of the project will establish a notable presence along Lincoln Way and set the tone for other redevelopment projects in the future. Due to the conceptual nature of the development as it has been presented to staff, it is imperative that as the concept evolves that it maintains consistency with the vision of 2 the Corridor Plan. Points of emphasis for the final project approval include providing apartments types designed for wide appeal and not as student housing, configuring apartments primarily_ as smaller units (2 bedrooms or less), focusing commercial space along the plaza to create an active and interesting environment, establishing preferences for commercial uses unique to Ames as a destination draw to the area, providing second floor office, and incorporating high quality building design materials and architectural treatments. The developer realizes that a number of formal approval steps are needed before the project can receive final approval from the City Council. Before initiating the land acquisition phase of the project, the developer is seeking an indication that the Council embraces the project concept and is willing to provide a TIF incentive to assist in bringing this project to fruition. With this level of preliminary support from the from Council, the developer will continue to refine details and prepare financial information. Ultimately, the City would need to complete the rezoning process and enter into a development agreement for the project to become a reality. The developer believes they can further develop their concept and its feasiblity over the next two months. It appears that the Argent development could serve as the catalyst project for the Downtown Gateway Focus Area. Therefore, staff believes it is worthwhile to continue to work with the developer to fashion a final project that is consistent with the priorities described in this report and Corridor Plan. If the Council ultimately agrees that the final concept results in a catalyst project, it would seem appropriate to consider the same incentive philosophy as was utilized in Campustown for the Kingland project. 3 Attachment A `.•'A N ns'� x :Af 19, i g �� 324 'ir 1 t 02 238! j 315 wr 401� NO 1 GI r 312 s. .,403 33428- 40 STd 02 GIIICHRI 116 -' 407 -r 1t8'11 "f1 N116 319 J'i 0�1113 n ° 401 319 C 319 Alley 419 319 319 403 335 30311 0 a 1 '415 403 335 327 ; 1 493 329 3 Subject Site � yr ��* f E0 �"'„•'u �s� x� 4 Q a a„ j 316 7° il A rte�M1 ,ag, 'w' � � dY�r� ' ' ` z$ Ov d"ae 117I� N Attachment A- Location Map 4 LINCOLIV WAY MIXED-USE I MASSING STUDY ARGENT GROUP / BAXTER CONSTRUCTION t' c DLR Group A,hfta. Engjmi,g Planning Wn ,, 23 MARCH 2O18 �� q � -° /////I//AEI � �y sr��/ C � .,,,pp'��° ��`� .,,� -=�-�-- ° � �r��lu�i�lliii�il6L��lfi�ii��1��'�"i�;�ltii�:'7ji'i��!! "� � ,,,�i � q ".� i „� � � �_ ° �rw�m�rvar�ar��:mr��rr�r ec���i�� r t�ra�;��,ze r t.� x ti. R s? LINCOLN WAY MIXED-USE I BUILDING VIEW 16 DLR Group 23 MARCH 2O18 PAGE 3 f Arcfiilepve Fle—ing Planningin Interinn g, � ,r 6 • Z9 LINCOLN WAY MIXED-USE I BUILDING VIEW ®DLR Group 23 MARCH 2O18 PAGE 4 ,�,a,;,,�„e Engina+ing Flannfng midnn i 9 �=i W... .. !.c .. � � �"...dam.• ...^-^}-,�aa—.d��� ate• • �. rd m.^�.CJ.^-. , ,' .z • _.. m ...ate. 4 wiz re ems. ;A el,���� Irk is, _z h qq ------------------- _ _.._ ,,'ie.lt`Ls.c" _ T„7' t '1 ^^S°'s , e <„ LINCOLN WAY MIXED-USE I BUILDING VIEW DLR Group 23 MARCH 2O18 PAGE 6 Atchilrnure E,4neuing Planning Interitxy MILLENNIAL HOUSING SUMMARY-LEVEL 01 MILLENNIAL HOUSING PARKING APPROX.137 STALLS gall RESIDENTIAL LOBBY/FITNESS 2,700GSF RESIDENTIAL BUILDING RETAIL 16,925 GSF MILLENNIAL HOUSING SITE AREA 80,240 SF _ rr� r 4— , I I I I 1 I `■ ,,, . I I e Lr it - - I I I I � I I Lr 1 I I r1�IL 0 I ■ �.,.. S�EMFA BOUNDMv I ....d. .. ]fa a STARRUCKS HOTEL DUILDING MII LENNIAL HOUSING LINCOLN WAY MIXED-USE SITE PLAN - LEVEL 0-1 DLR Group 23 MARCH 2O18 PAGE 7 adai�u<e F„g;nr,;ng Planning m;pfnn SUMMARY-LEVEL 02 MILLENNIAL HOUSING PARKING I APPROX.198 STALLS _..._..._..._...._...._._.. ..._....._....._....._......_ ..._ .. i _..._..._._..._.__...._...._..._.._...__....._......_......._.. _ r _ 1 _---_..__....... -------- --.. - �+ ----- I I I I� 1 - I I ---- -- i - I 19 13 14 I , �1 23 Ii - I 1 , t I ........_!I I , I , , I /�/��„r ;;l ;;:�). I � ,�;:,, fOJNf�Rrnet6l/� 1 1 1 7 I � PIIIuc PLAZA ., _._..._....... I I I I STARBUCKS HOTEL BUILDING MII LENNIAL HOUSING LINCOLN WAY MIXED-USE I SITE PLAN - LEVEL 02 23 MARCH 2O18 PAGE 8 DLR Group ArdlBetlwe Engineering Planting Inlailm SUMMARY-LEVEL 03 AMENITY SPACE 3,050 GSF MILLENNIAL HOUSING 44,460 GSF 11313 3 UNITS(3) 2BR 14 UNITS(28) ................ ........._....._.........................................................._.........._.............................._..............__....... ... .... __.. 9 UNITS 27 _............_.............._......................_..._..._..__.......................__..................................__......................_..._......._..._.__....... 3BR ( ) .......................................... 4BR 11 UNITS(44) TOTAL BEDS LEVEL 03 102 BEDS __-- —--- ' 1 __J=— 3BR I _...... 4BR i �28 BR LL + L+ .,..._.....- _ I � 1 3BR 4 ss ,.....-.......--��_ s. -� 2BR �dBR388 , —Ill r/ I I 1........... I l I l t 2BR 2BR 1 1 J 1; ...... , l 28R �- EAAAI--- _ z --_ AMENITIES €j v CDUflTVARO 3BR I 1 77 _ l . 1 I 1 I I 11 4BR IBR ,28P 38R 2BR' 3BR 2BR dBR I > I ,I 1 RESDENNAI EBRI, l' AMEN@ES AAMEMNE9 ?SflY�.,28 4BR SBA i 28R. u r ;IBR- l IENANT PUftli PLAZAI I CC D 1 1 li OW l i AMENITIES I 4BR' I. \�.-_.....--'_ .._..... 1 I I I� ... _.............._.................._._.......... ..............-_...................--'- i �. N STARBUCKS HOTEL.BUILDING MILLENNIAL HOUSING r LINCOLN WAY MIXED-USE I SITE PLAN - LEVEL 03 DLR Group 23 MARCH 2O18 PAGE 9 Ardiiwtlure Enyinee+ig Planning Inlerion SUMMARY-LEVEL 04(05-07 SIMILAR) GRAND TOTALS-RESIDENTIAL BUILDING MILLENNIAL HOUSING 48,812 GSF MILLENNIAL HOUSING 239,708 GSF 1 BR 4 UNITS(4) AMENITY SPACE/LOBBY 10,050 GSF 2gR 13 UNITS(26) 1 BR 19 UNITS(19) 3BR 10 UNITS(30) 2BR 66 UNITS(132) 4BR 13 UNITS(48) 3BR 49 UNITS(147) j ............... TOTAL BEDS-LEVEL 04 1112 BEDS 4BR 63 UNITS(252) -r--- TOTAL BEDS-LEVEL 04 550 BEDS - _ 1 ! --- ' -- ..._ -- RESIDENTIAL BUILDING PARKING ---- -- y- _-- - y _ _.. _--_-----..__ - 48P gp I 4 20R7 A 3BR I F 4i ARIST dBR .=f d8R ......_..... 1 s l 2BR r aBq. 7( ! I I --�xBR I I 2BR i I 3BR.- TB v i BaBw I I 1 3BR 2 4 £ R. :8R ._.. I ! I 3Bfl 2 4Hfl 7�0. , u ! 5 i �._..._.. ' y i___ I '.-'I .° '-•. �., I P ILI PLAZA I r ! TENANT 4 + {+ !BR snow 1 tl\ ......:: :�....._�.+ (�. HH0.9 I OW I I CB D 1 4, �m I ! = --- - .._.....-- - -..- -- - -------- ._.... . - - r� - N STARBUCKS HOTEL BUILDING MILLENNIAL HOUSING LINCOLN WAY MIXED-USE I SITE PLAN - LEVEL 04-07 DLR Group 23 MARCH 2O18 PAGE 10 ¢„g;,,m;l g Pianning lltl rn