Loading...
HomeMy WebLinkAboutA002 - Proof of Publication dated March 1, 2017 T i_egal'Notice Legal Notice NEWABLE GENERATION; e. The customer is responsible,fc REPEALING ANY AD ALL ORDI- the costs of interconnecting wit NANCES'OR PARTS OF ORDINAN- the City of Ames Electric Service; CES IN CONFLICT TO THE EXTENT electric system, includin! OF SUCH CONFLICT AND ESTAB- administrative/engineering costs LISHING AN EFFECTIVE•DATE.. transformers, service lines, o BE IT ENACTED,by the City Coun- other equipment determined nec cll for the City of Ames,Iowa,that: essary by City of Ames Electric Section One. The Municipal Code' Services for safe installation anc of the City of Ames,-Iowa shall be operation of the customer': Proof Of Publication In and the same Is hereby amended equipment with the City's system. by enacting a new Section'2.7 as f. The customer is responsible foi THE AMES TRIBUNE follows: any costs associated with re "Sec.2.7Availability of Net Meter- quired inspections and permits. --------------------------------------------------------------------------------- Ing Sec.2.7(2) Metering Net Metering Is available to any' Standard metering under this.tar• retail customer receiving electric iff shall be performed by a single STATE OF IOWA, STORY COUNTY,ss. service under a City of Ames Elec- meter capable of registering the trlc Services rate schedule who flow of electricity in two direc• owns and operates an approved tions (delivered and received) tc I, Scott Anderson, on oath depose and d say that on-site generating system pow- determine the customer's net en- p y ered by a renewable resource ca- ergy flow. I am Publisher of THE AMES TRIBUNE, gable of producing not more than Sec.2.7(3) Net Energy Usage and 500 kVA (kilovolt-amperes) of Net Energy Production a daily newspaper, published at Ames, power, and. who Interconnects The net energy usage Is the,net with the ,City of Ames Electric energy flow In kilowatt-hours de. Story County, Iowa; that the annexed printed . Services'electric system. In order livered to the customer. The net to qualify for this tariff an appil- energy production(a.k.a.negative cant must first obtain approval to kilowatt-hours or kilowatt-hours Interconnect and meet the City of received)is the net energy flow In Ames requirements, as deter- ' kilowatt-hours delivered to City of mined by the city of Ames Electric Ames Electric Services. Net ener- Services department. gy usage and net energy produc- 1 Renewable energy technologies. tlon are separately metered for CITY OF AMES Include those that rely on energy each billing period and are treated derived directly from the sun; on ,.by different,rates,as described in Ordinance No. 4288 wind, geothermal, hydroelectric, 2.7(4). wave, or tidal energy, or on bio- .Sec.2.7(4) Rate mass or- biomass-based waste Beginning in the billing month af- Products,-Including landfill gas. A ter,a customer.receives approval renewable energy technology to Interconnect the customer's does not rely on energy resources on-site generating system from was published in said newspaper I derived from fossil fuels;,waste City of Ames Electric Services,net 1 time(s) on March 1, 2017 r products from fossil fuels, or energy usage and.net energy pro- waste products from inorganic duction will be billed as described the last of said publication sources. Net metering applies to below. a customer-owned generating a. For each billing period, all was on March 1, 2017 system that primarily offsets part 'kilowatt-hours billed as net ener- or all of the customer's electric W usage (kilowatt-hours deliv- service energy requirements pro- eyed)will be accounted for based vided by City of Ames Electric •on the appropriate electric rate Services. schedule In affect at the time. All #922072 The availability of this tariff is 'applicable state and local taxes, ORDINANCE NO. 4288 limited to the first 2,000 kW of" and the current Energy Rate Ad. ORDINANCE TO AMEND THE OF quallfied and Interconnected gen- Justment(ERA)will be added. MUNICIPAL CODE OF THE CITY OF :ration (based on the aggregate b.,For any billing period in which" AMES, IOWA, BY REPEALING SEC• ' sum of the in system out- net energy production is recorded, TIONS 2 7, 2 7(1)(2)(3)(4)(S)•'AND put ratings of all interconnected the kilowatt-hours received shall ENACTING NEW,.SECTIONS "2.7, systems served under this tariff). be converted to monetary credits 2.7(1)(a)(b)(c)(d)(e)(f), 2 7(2), All of the requirements, benefits, calculated by multiplying the 2.7(3),2.7(4)(a)(b),TO APPENDIX H.1'so6lated terms and conditions of thlstariff' kilowatt-hours received by the ap- ELECTRIC NET METERING THERE- are subject to change:Customers .propriate electric rate schedule ih OF,FOR THE PURPOSE OF ESTAB- receiving net-metered service un- affect at the time." LISHING NET-METERING REGULA- der this tariff assume all risks as- Section Two. All ordinances,.or TIONS FOR CUSTOMER-OWNED RE- with future'changes to parts.of,ordinances, in conflict this tariff. herewith are hereby repealed to Sec.2.7(1)'Conditions of Service the extent of such conflict,if any. a. All charges,_character of serv- Section Three. This ordinance $4.*'"'oc, KIMBERLY NELSEN Ice, and terms and conditions of shall be in full force and effect & the Clty of Ames Electric Services from and after its passage and .Commission Number 79.0054 Rate Schedule under which the publication as required bylaw. customer receives service apply Passed this loth day lof January, My COm1ni Sion Exp.May 19,201II I". except as expressly altered .by 2017. this"Availability of Net Metering" Diane R.Voss,City Clerk rule. Ann H.Campbell,Mayor b.The customer shall comply with ' A lF,J U s ZJ�-I r the current City of Ames Electric Published In the Ames Tribune on Services' interconnection requl'�e= March 1,2017(1T) (V1 ments for A Net-Metered Renewa- Notary Public I ble Energy Generation Facility,S00 kVA and Smaller, and any rev]- sworn to before me and subscribed in m t slons to the requirements. y c.'The customer shall'obtain ap- presence by Scott Anderson Proval!to Interconnect its pro- Posed System from the City of this March 1, 2017 Ames Electric Services Depart- ment-before the customer pur-' chases any,equipment or*con- AMT: $61.31 ' cludes Its design for:an on-site I generating.system that is Intend. AD#: 922072 ed to Interconnect with the City of, Ames Electric Services' electric ACCT: 33408 ? system. d.'The customer,shall submit to City of Ames Electric Services a completed interconnection appli- cation form 'and signed agree- ment.