Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A008 - Revised Council Action Form dated October 11, 2016
ITEM #: 33 — REVISED DATE: 10-11-16 COUNCIL ACTION FORM REQUEST: REZONE FROM HIGHWAY-ORIENTED COMMERCIAL (HOC) AND AGRICULTURE (A) TO HIGH DENSITY RESIDENTIAL (RH) AND HIGHWAY-ORIENTED COMMERCIAL (HOC) WITH A CONTRACT REZONING AGREEMENTAT 3115, 31191 3301, 3325, 340% AND 3413 SOUTH DUFF AVENUE BACKGROUND INFORMATION: The subject site was originally noticed for a public hearing ,for September 27th. City Council on the 27th then continued the public hearing at the request of the developer to October 11th to allow the developer to refine their project description and continue to discuss provisions of the contract rezoning agreement that accompanies the request. The property owners, Dickson and Luann Jensen, request rezoning of six parcels comprising a total of 45.92 gross acres. The parcels are addressed as 3115, 3119, 3301, 3325, 3409, and 3413 South Duff Avenue. Two of the properties (3301 and 3325) are currently zoned Agriculture (A) and the remaining four are zoned Highway-Oriented Commercial (HOC). See Attachment A for current zoning and location. This site was recently the subject of a Land Use Policy Plan Amendment designating much of the area for high density residential development, while retaining a portion of South Duff Avenue frontage as Highway-Oriented Commercial. The proposed rezoning includes a contract to address terms of needed public improvements in the area and for limitations on use of the site. These properties lie along the west side of South Duff Avenue (also referred to as US Highway 69). The subject site has two separate frontages on South Duff Avenue. The subject site lies north, west, and south of Story Memorial Gardens, a private cemetery at 3215 South Duff Avenue. The north boundary of the site lies near the Crystal Street intersection with South Duff Avenue. The south boundary of the site lies immediately north of the New Life Church at 3505 South Duff Avenue. The property extends westward to the Ames Municipal Airport property. The applicant has submitted a rezoning request for 41.30 acres as High Density Residential (RH) with 4.62 acres remaining as Highway-Oriented Commercial (HOC). The project initially included a master plan as part of the application that has since been refined into a concept plan as an exhibit to the rezoning agreement. The Concept plan was includes a conceptual layout of the site with primarily one and two bedroom apartments units on the RH portion and for commercial to be located at the new intersection with Crystal Street. See Attachment B for the proposed Concept Plan. The plan reflects conversations with the developer from the past year for a project that would focus on mostly 1 bedroom and 2 bedroom units (with some 3-bedroom) apartments designed with additional on-site amenities that would be marketable and 1 desirable to a range of households, but focused on workforce housing. The developer intends to construct a mix of one and two bedroom apartments with a maximum of750 units. The rezoning agreement allows for up to 10 percent of the constructed units to have three bedrooms, the rest of the units must be one and two bedroom units. Crystal Street would provide a northern access point to the project for a looped internal street system that would circulate through the site to a second entrance onto South Duff Avenue at the south end of the site. The commercial component is also in keeping with prior direction by staff that an area for small scale commercial should be maintained to meet the general needs of the broader area. Upon rezoning of the site to RH, the development will be subject to administrative approval of a Minor Site Development Plan(s) prior to initiating construction on the site. The developer intends to seek a Master Plan approval in the future for Council to consider,an alternative parking lot landscaping concept based on a prairie design with berms and fewer trees that normally would be applied to parking lot landscaping. The developer believes this will create a unique environment to help with the character. The proposed rezoning boundaries do not follow the current property lines. See the Rezoning Plat in Attachment C. Rather, they are described by metes and bounds irrespective of property lines. The intent is to replat the properties (either by plat of survey or subdivision plat)'in the near future to reflect the zoning boundaries and future development lots. The attached addendum includes a full description of the concept plan and analysis of the rezoning proposal, including a review of needed infrastructure to support the proposed development. The analysis relies upon the previously completed traffic, stormwater, and sewer evaluation that were part of the LUPP amendment approval. The analysis also includes the RH checklist that includes evaluation of a number of issues related to consistency with the LUPP. The checklist was also part of the LUPP amendment process, the most substantial differences in the evaluation relate to having more project specific building information from the concept plan and commitments from the developer on features of the project as part of the contract rezoning. As described at the time of the LUPP amendment, more details about infrastructure improvements and commitments for improvements were needed prior to rezoning of the site. In order to facilitate the installation of the needed infrastructure to meet existing needs, future needs, and needs brought on by this specific development, the City and the developer have prepared a contract rezoning document to identify what specific improvements must take place and the party responsible for paying for those projects. Staff and the developer have negotiated obligations for stormwater costs assigned to the developer and street improvement costs assigned to the City. Staff and the developer are at an impasse on one issue related to street improvement costs. The widening of South Duff could trigger Ames Electric relocation costs for lines that exist on the east side of South Duff from approximately Crystal to Ken Maril Road. City staff believes relocation is unlikely, but since a final design has not been approved by Iowa DOT, staff has attempted to negotiate with the developer and an equal share in the risk of this cost that is estimated $750,000 with a 50/50 split of the 2 cost and a cap on the developer's share at $375,000. The 50/50 split reflects the proportionate length of project related widening needs to the overall length of electric relocation that is needed to do all the improvements. The addendum-includes a more complete explanation of the rationale and Attachment G is the draft rezoning contract. Planning and Zoning Commission Recommendation: At a public hearing on September 7, 2016, the Planning and Zoning Commission reviewed the rezoning request with a master plan described 700 one and two bedroom apartment units. The Commission voted (5-2) to recommend that the City Council rezone the subject properties with conditions concerning infrastructure improvements. There were no comments from immediate neighbors at the meeting. One person spoke in favor of the project noting that the collaborative efforts of the City and the developer could solve the storm water issues experienced by homeowners on the east side of South Duff Avenue. Commissioners were concerned about the size of the development and the impacts on traffic and storm water and how well it rated on the RH checklist. Other commissioners were satisfied that the recommended infrastructure, once installed, will improve existing conditions and could provide for more housing choices within the City. ALTERNATIVES: 1. The City Council can approve the request for contract rezoning from Agriculture and Highway-Oriented Commercial to High-Density Residential and Highway-Oriented Commercial that includes a concept plan and certain improvement obligations for the developer and the City with receipt of a signed agreement (Attachment F) prior to the third reading of the_rezoning ordinance. These are: • City to widen South Duff Avenue (City Cost). • In the event Ames Electric Poles require relocations on the east side of South Duff, a split of the costs at 50/50 not to exceed $375,000 for the developer. • City to install traffic signal at Crystal Street intersection (City Cost). • City to install shared-use path along east side of South Duff Avenue (City Cost). • Developer to construct stormwater improvements as identified in Teagarden Drainage Study, in addition to his own stormwater needs (Developer Cost). • Developer to install 5-foot sidewalk along his frontage as well as along cemetery frontage (Developer Cost). • Intensity of use limited to 750 dwelling units configured as one and two bedrooms apartment dwellings with up to 10 percent allowed as three-bedroom apartments. The project design shall incorporate brick materials and on-site amenities commensurate with phasing of residential development. 2. The City Council can approve the request for contract rezoning from Agriculture and Highway-Oriented Commercial to High-Density Residential and Highway-Oriented Commercial that includes a concept plan and certain improvement obligations for the developer and the City with receipt of a signed agreement (Attachment G) prior to 3 the third reading of the rezoning ordinance. (DEVELOPER REQUEST) These requirements include: • City to complete any needed electric relocation (City Cost) • City to widen South Duff Avenue (City Cost). • City to install traffic signal at Crystal Street intersection (City Cost). • City to install shared-use path along east side of South Duff Avenue (City Cost). • Developer to construct stormwater improvements as identified in Teagarden Drainage Study, in addition to his own stormwater needs (Developer Cost). • Developer to install 5-foot sidewalk along his frontage as well as along cemetery frontage (Developer Cost). • Intensity of use limited to 750 dwelling units configured as one and two bedrooms apartment dwellings with up to 10 percent allowed as three-bedroom apartments. The project design shall incorporate brick materials and on-site amenities commensurate with phasing of residential development. 3. The City Council can deny the request for contract rezoning from Agriculture and Highway-Oriented Commercial to High-Density Residential and Highway-Oriented Commercial with the attached master plan. 4. The City Council can defer action on this request and refer it back to City staff and/or the applicant for additional information or with specific direction for changes. MANAGER'S RECOMMENDED ACTION: The need for additional housing opportunities was reviewed in conjunction with the LUPP amendment earlier this year. With the ongoing needs for versatile housing options that meet workforce needs there was support for development of the subject site. The developer has now proposed a concept that demonstrates how that need is met and a commitment to a specific project. With the contract rezoning elements capturing the basic development details for the project with up to 750 units of 1, 2, and 3-bedroom configurations of apartments. The language of the contract addresses only minimal details in terms of intensity of use, a requirement for a substantial amount of brick, and a condition that the Developer provide amenities consistent with the conceptual development of the site articulated by the Developer. The Developer believes the proposals meet the housing interests of the City in that the site itself is adjacent to services and jobs, which are desirable traits. The Developer believes that although it is not incorporated into an existing neighborhood the style and character of the project will yield a desirable living environment despite the potential undesirable compatibility issues with the external uses of the airport, commercial development in the area, and a cemetery. The proximity of the airport is clearly a unique issue with this request and how its operations impact the desirability of the site for future residents. As discussed at the time of the LUPP amendment, there are traffic and stormwater improvements needed to serve this development and support the broader area. 4 Stormwater can be improved with the joint actions of the City and developer based on the recommendations of the Teagarden Study. And, with the specific identified improvements of the Traffic Impact Study, levels of service can be improved and maintained from the opening day of the development through year 2035. The recommended conditions for traffic improvements create a list of feasible improvements that can be completed in the near term rather than asking for fair share contributions to a variety of projects that are not yet part of the City's Capital Improvement Program (CIP). Ensuring that traffic and stormwater improvements are completed along with future development of the site is critical to the evaluation of the request. To that end, the City Council should approve the rezoning only with the rezoning contract detailing specific improvements and the responsible party. In the event the City Council does not want to partner in the trade-off of stormwater facility improvements for transportation improvements, alternative contract details for the developers transportation improvements obligations should be agreed upon prior to rezoning of the site. In this case, staff believes it is mutually beneficial to divide the infrastructure responsibilities as described in the contract rezoning agreement (Attachment F). Without the agreement, the City would have costs of approximately $900,000 for Teagarden stormwater improvements on its own and no street improvement costs for the development. In the agreement, the developer would bear all stormwater costs, but the City would assume all road improvements needed for this development and beyond. Staff estimates a wide cost range from $576,000 and $2,726,000, depending on the final design of street improvements, receipt of $1.4 million in DOT grants, and potentially $750,000 costs in electric relocation. With receipt of DOT grants the costs are between $576,000 and $1,326,000, depending on electric relocation. The contract rezoning agreement has one significant difference between the developer's requested alternative and the City Manager's recommendation for off- site improvements. City staff believes that although it is unlikely that the widening of Duff Avenue will trigger relocation of Ames electric lines, if that was to occur it should be a shared cost. The relocation cost estimate is $750,000. Staff believes that since the development related widening is roughly 50% of the total length of the electric line relocation it should be a shared cost between the two parties, with a cap at $375,000 the developer's cost. With the cost sharing provision in Attachment F, the City costs for the road widening after DOT grants would be between $576,000 and $951,000. Therefore, it is the recommendation of the City Manager that the City Council act in accordance with Alternative #1, which is to approve the rezoning from Agriculture and Highway-Oriented Commercial to High-Density Residential and Highway-Oriented Commercial with the contract rezoning agreement reflect in Attachment F to be signed and returned prior to the third reading of the ordinance to rezone the property. 5 ADDENDUM Existing Land Use Policy Plan. The Land Use Policy Plan future land use map was recently amended to designate much of this area as High-Density Residential from Highway-Oriented Commercial. The South Duff Avenue frontage lying north of the Story Memorial Gardens cemetery remains as Highway-Oriented Commercial. See Attachment D for an excerpt of the LUPP future land use map. The proposed rezoning is consistent with the LUPP designation. Existing Uses of Land. Land uses that occupy the subject property and other surrounding properties are described in the following table: Direction from Existing Land Uses Subject Property Subject Property Farmland, three homes North Commercial East Residential South Church, homes West Ames Municipal Airport Existing Zoning. The current zoning of this property is HOC. See Attachment A for a zoning map. Concept Plan. The developer originally submitted a voluntary master plan for the RH rezoning. The developer has since revised their intended design and crated a concept plan to help further refine their development idea. In the concept plan, the developer identifies the whole site to be developable areas. There is an existing stream channel in the north area of the site that will likely be part of future storm water improvements and not conserved in its current state as it will be altered to meet the development needs of the site. Review and permitting of those specific changes would occur through the site development permit process. The developer also seeks to do unique landscaping and include significant berms along the perimeter of the project. The concept plan proposes areas for residential development on 41.30 acres of the property and commercial development of 4.62 acres. These are gross acreages and does not account for the 50-foot right-of-way easement along the US Highway 69 frontage, future storm water detention areas, and any common open space that might be included in the apartment complex. The concept plan proposes up to 706 apartment units, although the contract allows for up to 750 units. The developer described to the Planning and Zoning Commission an interest in a combination of one and two bedroom apartment configurations for a total of approximately 700 beds in the project. Since then, the developer seeks to accommodate residents who might have a need for a three bedroom unit. The proposed density of dwelling units is between 11.63 and 17.50 dwelling units per acre. The densities are calculated on gross areas and, as noted above, do not reflect what will be reserved for other uses, thus reducing the developable acres. RH zoning requires a 6 density of between 11.2 and 38.56 units per net acre. When a site development plan is submitted showing storm water areas, common open space, and other areas that can be netted out of the development, the densities will increase but remain within the allowable range. Commercial coverage will be evaluated at the time that a site plan for a specific development is submitted. HOC zoning requires only staff review and approval. The concept plan has been incorporated in the Contract Rezoning Agreement and includes provision for its implementation in the Design section. The agreement also specifies the project must include substantial amounts of brick on the exterior facades of each building and that on-site recreational amenities are provided for with residential development. The intent of these provisions is to capture the Developer's statements for the type of project he envisions and how the City has relied upon that description in the evaluation of the rezoning request as the use and design meeting the housing needs of the city. The project will be principally one and two bedroom apartment homes with a clubhouse and amenity spaces. Commercial development will occur at the front of the site. Access. The concept plan includes three access points along South Duff Avenue (US Highway 69). The northern access will be at a signalized intersection in alignment with Crystal Street. This will be the main entrance into the development. Due to access management interests along an arterial street, shared commercial and residential access will likely be required in the north part of the site. -- A second access point is proposed just north of the property line with the cemetery and will be evaluated in greater detail at the time of site plan review. This second driveway would not be signalized. The southern access will not be signalized, either. It will be located about midway between Jewel Drive and Garden Road, south of the cemetery. The RH rezoning area includes a 35-foot "flag pole" along the north boundary and another 35-foot "flag pole" immediately north of the north boundary with the cemetery. The flag poles will be platted as part of the residential lots and will provide the necessary frontage for those lots on a public street. These "flag poles" of residential zoning are not needed to ensure access to South Duff as a residential driveway can be configured through a commercial site, but are desired by the applicant to be shown as residential at this time. Traffic. A traffic study looked at current levels of service, future levels of service (year 2035) without the development, opening day of the development, and future 2035 levels of service with full build-out of the development. The study identified needed improvements along the US Highway 69 corridor as a result of general growth in the community. However, it also identified specific improvements needed to mitigate the impacts of this development on levels of service on this corridor. The study recommends the following improvements: • Construct a signal at South Duff Avenue and Highway 30 Eastbound ramp. 7 • Construct a signal at Crystal Street and Highway 30 intersection to serve the new development. • Extend the three lane cross section south to the new south entrance to the proposed development, or possibly to Garden Road. • Construct an additional left turn lane from Airport Road to South Duff Avenue. • Improved pedestrian and shared use path connections along South Duff Avenue. However, not all of the above projects with the developer's contributions are able to be completed independently or identified within the City's transportation plans. Therefore, as part of the contract rezoning, staff in consultation with the developer, has identified the following full improvements as appropriately addressing the projects transportation needs and impacts on the system. The list below would be the minimum improvements needed to maintain the quality of the transportation adjacent to the site. • Construct a signalized Crystal Street and US Highway 69 intersection to serve the new development. • Extend the three lane cross section south through to the new south entrance to the proposed development and through to Garden Road. • Improve pedestrian and shared use path connections along South Duff Avenue including extending the shared use path on the west side of South Duff Avenue to Jewel Drive. The rezoning contract specifies that the shared use path, South Duff widening, and Crystal signal are the responsibility of the City and that frontage improvements on the west side of South Duff are the responsibility of the developer. Without the contract as it is written, the developer would be responsible for those improvements that are caused by the development and the City would be responsible for those that are due to existing conditions and the general expected increase in traffic to the year 2035. The discussion below more fully described the costs associated with the intended improvements. Storm Water Management. There are three drainage areas on the west side of South Duff Avenue that carry stormwater under the road to the east side. Property owners have expressed concerns that development on the west side of South Duff Avenue will exacerbate existing conditions and lead to localized flooding and wet basements. There is also a concern that, infrequently, the highway is closed due to stormwater overtopping the roadway. The recommendations of the recently completed Tea Garden storm water study offer the maximum amount of flood protection without creating a larger future hazard of impounding water as a dam or creating a body of standing water that would be a flight hazard to airport operations. Using that study, the developer has done further analysis to determine what storage requirements will be needed to achieve the improvements needed by the City and to mitigate the increased runoff due to this development. The findings of the study illustrate that development of the site could be done in a matter that meets City and downstream interests. If, however, the proposed project does not move forward, the Public Works department is prepared to move forward with a project to 8 improve storm water management in this area. If a cost agreement on cost with the developer is not reached, the City and the developer would separately have to undertake storm water improvements. Other Infrastructure. City sewer and water service are readily available and require only minor extensions. Extensions from the northwest corner of the site to a larger electrical service in Airport Road are needed as this is on the periphery of the Ames Electric territory. These costs will be the financial responsibility of City of Ames electric service. Contract Rezoning. At the time of rezoning, Code of Iowa, Section 414.5 allows for the City Council to consider agreements for limitations on use of property and improvement needs related to the rezoning request and enter into a form of a development agreement known as a Contract Rezoning. There are a number of improvements needed to address the increased traffic and provide better access to this development. Completing these improvements comprehensively provides a general benefit that would be delayed through piecemeal implementation of improvements in the area. Likewise, there are stormwater improvements needed without this development as indicated in the recent Teagarden Drainage Study. The City estimates that the cost for those improvements if borne by the City is approximately $900,000. The developer must also accommodate stormwater management requirements above and beyond the improvements needed for the City. City staff and the developer discussed costs and funding mechanisms for the required improvements. The proposed Contract Rezoning spells out obligations for the developer and for the City. The developer would have no responsibility for improvements identified as City cost. In summary, the developer will be responsible for the stormwater improvements—both the City's needs and his own needs while the City will be responsible for much of the transportation improvements to the South Duff Corridor. The developer will ensure that storm water improvements are completed no later than October, 2018. With any contract that places an improvement burden upon the City, funding sources are important to identify to understand the impacts on different programs within the City from the new obligations. Additionally, as part of the South Duff improvements, the City intends to work with the Iowa Department of Transportation (DOT) to complete the widening of roadway from not only Garden Road but to Ken Maril Road as a comprehensive transportation improvement that is beyond the direct development impacts identified within the Traffic Study, but is needed as long term improvement for the area. The proposed extended improvements that will be the responsibility of the City include: Widening of South Duff Avenue to a two-lane cross section with a center turn lane to Ken Maril Road (est. cost $1,250,000). 9 • Traffic signal at Crystal Street and South Duff Avenue (est. cost $350,000). • Shared use path from State Nursery to Ken Maril Road (est. cost $376,000). The total estimated cost is $1,976,000 for the above improvements if there is no relocation of Ames Electric transmission lines along the east side of South Duff. In preliminary discussion with the DOT, it is believed that the widening of South Duff will principally affect the west side of the road and the existing high voltage transmission lines along the east side of the road would not be affected. However, a final design has not been completed for the transportation improvements and there could be unforeseen complications that could potentially necessitate relocation of the electric lines. Ames Electric estimates that the relocation of the electric line from roughly Crystal to Ken Maril Road would cost a minimum of $750,000 and would likely be relocated to the east side of Duff to accommodate needed space. The development related widening of South Duff is approximately 2,000 feet from Crystal to Garden Drive. The overall electric line relocation is estimated to be as much as 4,000 feet due to the overall widening needs of South Duff. Until a final design is approved by the DOT, it is unknown if these lines would need to be relocated. City funding sources will likely include specific state grants, one of which the District 1 office of the Iowa Department of Transportation has already made application for on our behalf to support the extended widening length to Ken Maril Road. Of the estimated cost, the IDOT has indicated that up to $1,400,000 is available in state funds, leaving $576,000 for local contributions to transportation improvements. A funding source has not been identified for this local match, but it could be General Obligation bonds or local option sales tax. Funding for the City's match would be identified as part of the Capital Improvement Program (CIP) budgeting. If the rezoning is approved, staff will prepare projects for City Council approval as part of the CIP for 2017-18. If the state grants are not at the amount expected, the City retains the right to determine the ultimate extent of improvements and their specific timing based upon funding and project cost. Additionally, the DOT must approve the specifications for any widening since South Duff Avenue is a state highway and the City will be subject to their approval. The City will have an obligation for the traffic signal installation regardless of the other South Duff Avenue improvements as the terms of the contract rezoning have been written. The developer assumes all costs associated with storm water improvements. Other costs to be borne by the developer includes utility extensions to bring sanitary sewer and water from the east side of South Duff Avenue to the site and a five-foot sidewalk along the Brick Towne frontage as well as along the cemetery frontage. The developer will need to provide the public water mains within the site to serve fire hydrants. RH Site Evaluation Matrix. City Council directed that proposals for apartment development be evaluated with the RH matrix. The matrix language was designed to articulate the goals and objectives of the LUPP into specific statements relevant to individual sites and to help establish a common context for evaluation of proposals on a 10 case by case basis. The purpose of the matrix is to evaluate if a specific site is suitable for multi-family development, the matrix does not set a minimum scoring requirement nor does it evaluate if alternative uses are also suitable for the site proposed as residential. Staff has "rated" the proposed development, which can be found in Attachment E, and described the highlights of its determinations below. Overall, the site received mixed ratings. While there is more detail with the proposed master plan accompanying this rezoning request than there was at the time of the LUPP amendment, certain details are not included which would impact the scoring, especially specific plans for the Housing Type and Design category. Location/Surroundings: The site is not well integrated into adjoining neighborhoods. To the west is the airport and the site is separated from the residential neighborhood to the east by Highway 69. The airport runway is approximately 700 feet from the western most property line of the subject area. Other uses on South Duff Avenue are the cemetery and a church: However, the site is rather large and can develop its own neighborhood identity with appropriate design and layout. Employment opportunities would exist within the proposed and adjacent commercial areas. Other opportunities exist in east Ames, along the South Duff Avenue corridor and at the ISU Research Park to the west. This site would also be attractive for those wishing to commute to Huxley or Ankeny. Site: As noted previously, the site has three drainage ways that will need to be improved and around which the development needs to be designed. However, there is no designated floodway fringe on the site. There is a stream channel along the north property line of the site that would likely be modified for a new street intersection and enlarged for storm water detention. The site will be near the Ames general aviation airport. The airport mostly serves propeller-type airplanes and limited jet service (but no scheduled commercial flights). Because of the location of the development site in relation to the runways, there is no identified aviation hazard which could impact airport operations. The site could generate noise complaints depending on the times of flights and sensitivity of residents. Housing Types and Design: Housing design is not generally required as part of a rezoning request beyond the description of building types and intensity of use for a Master Plan. But based on our discussion with the developer, the fagade materials will likely contain a substantial amount of brick and a commitment to a number of on-site amenities to differentiate the proposed project from other projects in the City. That discussion generated one of the conditions of approval. Other information is not available—thus the low scores on those criteria. The developer proposes to target these apartment units to a workforce tenant. He anticipates mostly one-bedroom units in buildings with up to 72 units in any one building. The statement of intent for smaller unit sizes could be viewed as supporting a needed housing type at the rezoning stage and was rated high in accordance with our desire to broaden housing options from recent trends. Development is not anticipated to be low or moderate income housing. 11 Transportation: For transit access, staff rated the site as average due to the front half of the site being within a '/4 mile distance of the bus stop. However, the majority of actual apartment unit locations are likely to end up being further than the '/4 mile target, unless CyRide establishes a new bus stop along South Duff Avenue. The nearest Yellow route stop is at the intersection of Jewel Drive and South Duff Avenue. Staff rated the quality of service for the Yellow route as low reflecting the current use of a small bus on the route. With the Yellow route, a person may take a bus and make connections during morning hours or after work to meet an 8 to 5 work schedule. Very limited midday service is provided by the Gray route, and there is no evening or Sunday service. With added sidewalk and shared use path improvements on South Duff Avenue, access to the north should be much improved. The development should have a well-defined internal shared-use and sidewalk system in order to safely direct users to the South Duff Avenue corridor. Under current conditions though, it has poor connectivity and was rated low. The commitments that will need to be made for traffic improvements on South Duff Avenue and the various intersections are critical to assuring an improved level of service on this corridor. And the timing of those improvements should be such that they are ahead of the future forecasted demand. With future improvements along the Highway 69 corridor. and the site's frontage, this criterion would score higher. The primary concern would be the offsite intersection service levels in the cumulative growth scenarios, with or without this project. Public Utilities/Services: Staff evaluation of sanitary sewer capacity and water usage does not indicate any constraints for the development. The recommendations of the Teagarden Drainage Study, when implemented with the development, should improve current stormwater drainage issues. The fire station lies only 3,500 feet north of the southern-most extent of the development. Fire response time should be minimal. Investment/Catalyst: The City never envisioned this as a potential residential neighborhood before this development was proposed. The size of it could allow it to be a self contained or private community, thus it may become an identifiable development even though its sits outside of an indefinable neighborhood. Retaining a commercial area at the front will provide shopping and employment opportunities to serve this neighborhood as well as serving the 12,000 vehicles (2011 MOT traffic count) per day on this section of US Highway 69. Public Notice. Notice was mailed to property owners within 200 feet of the subject site and a sign was posted on the subject property. As of this writing, no comments have been received. 12 ATTACHMENT A: CURRENT ZONING AND LOCATION RH HOG NRPORT-RD S=GA HOC ruTTY_tfAVY 'DR F Opq RH RU6'Y_C[R ONYX-ST SrGA CRYSTALST � i^� 1 OPAL CIR s-GA .. _ J JEWEL DR RH - of ql RM I_ a C)o_ F P•12D j�; � ��G�, RL F PRn Q S-GA u A o GARDEN.RD Cq4 S-GA �4 Tti J TEA.GARD Ef l DR ¢, ti S-G A KEN.Ml AIR]L RD _j �--�� Legend A, 1,- 0 300 600 A rn e s.. aet Subject Site Ames City Limits 13 LOT 1 LOTA TOTALS S.i0AC0.E5 teb Uf:R3 tt� �£ YXACR55 EBa3t LLLSR£aN£iJ'iK?R'YlDE^. f€ s 1 a— LOT C•VNGES D D £ y.l �- .]STKtSL� IhiPdnDEn � S ssir�.c �u LOTD �' .n,tcrmsvrnreRn xer �' ". F,'tharF,t" jaaso as-omh1D ;C55 Iw� -S1 VAR G PRO`ADED LOTT+DK �g�f� :CB 6T%!. HOnDED a.11 AC,�i:5 iRJ'.".OEO �( �nj LOTS LOT 7�^ �7;n %CRES 1.AMS ,,wrx w *'e•! £ �"PtJpp.' �� \/ Ee RJaN eYay.WgNGPEGu.RED sexiMrJNGRROWDEo � ` 1" r++rEP.;asF l�.DtlE� "' � ��� Y r" Z i ! W LOTS .tlI 44-LLI.aJ.-le4s�3LLi.i "q,�'r "Fds cnTmo vrtr Lam. C,.. 'd:�'T•i L ..uACREs Gartnti 1R,Dwu. fF„ ' o��rt. D[4Nr,WeS 51YNUBW TETi CLC9PC„5E W L 1 L.Lf1;L.-^-J I� w•NE«`vEwcE f 3 'j' 3� ,F""8",( L d T ' � �i ��� - O :e iARK«a axr+o n e`xxux �� k s.1, 4.-0 0 LOT4k aci+carw' E �1 sorA w1lTRm1w'hr �a3 �I wwvisElB A+tr�, ror �:� a iArwrm acawReo 1 i u+` akj j� g' C; LOT 5 r a K 3 )cTURC:1 'M. � � ++ [ F 'Lri fiBl Gry'TT�:"ii'i __..._._.._ _ m eovAac..oPEaEaEn � a �gl � �. ,sFwT 1ss �'!jKOT{.�.' x.R:%«nw,aD ( � � s� ) SuLcsuusu ` I v LOT6 AVJ,V9{BEAN : `� f� E- r :±i.AcaR tt }, �� t_i� •'9 i'(k1T fP PS('k E'Sr3 i 1 j _..... _.. _._. ...._. ...._._ ._.... -- ]:1iAR%I«OREOtYRED ........._ ip,i m NORTHBRICKMITOWNE 7ras*uLs wo-noE� B GNULESMD•10ED AT MUTH DUFF Q 2 m r m -n u I I i i REZONING PLAT . AT A �r BRICKTOWNE DEVELOPMENT D Jensen Group 4E i � E Frrtr�Esrrclrlur�� � A 2 4 "� �� � ✓t fAY M iR n iM KiklW Sin rkWYi`MSl RNARR�iW%tR 542 NYI 0`A YifF Rt y' AaI I'iTnE'tA(d�'f,�dt CI MAC W.IR( Na. # " � iY i VCl)?t 1tI5.�iJha MET ltkt"AM tAY YRRI C v. '` � twi.<Ilestt(1,}en...3S>u A.EAfpt .Utlt.l'u'xf ck:u.whNnd .:.. EE e� t w l f r xra rr sscau . to a Jet n tNl A.1 A u a x Z 4Y `Y ( h 1. Enka suln uxw s+rc_ ,k � (: Rti£b41 �1 �.. M`}J�tl3EG FDY C'hN4 YLT3AUTRT kNE13 C6�fAACiNF NORIRMxAEQt=M'EPi(CRW Aa.{PAA�.M1ES, _AW inn «: 1 '£ yp' :+- E[[ E6it E0':3P .a`6t.,m:h...;CtAti .'AY AS.R?a5csil.ilx«6-..+thf S:Cv.A. P M 5Y12 t �e'T7J 3T A 2x NIT Rey �� YM<2C•rAP.Vn Rn45tAnI1N45YXl f2t'%R.pY"JAM51 (KRA R. .Y9 N1T lK��nIP .. �.�� (Y'6.vYfdXtY tS atC NNYig`TA. 0Y[T't.[D S1.4 tRtYtd ,`G 4JS.N.Y . ., tan:q >, >. f ...._ ': axR Y... - >� Dt'4CPiNb ASFVA '1 API.CT.Jf5lti SttGTi H41J•TYVA2Y MIM SRIFA tiW IkIN2YskNlA AS•Yf O :Gv E -i`f' >'• ••W !.. X SxIS h'�MSEA.t1% 4.iK,5 At SrS('i Yr(IE xwm4%S J.t {k1' tVm'A AC iN PA v ..., hR25P � :\ (K YY aiBta R1 of F1E SMPM ST'NT CNUH2(�.h RSSI Thtat CNttiC'r!T�S'aLeW,fkEl I N Vl E _ FW.tt.5•A•ANtt'0'FPNti6'tt6ktllt"ISASTMMRM1h 31}OL RiE k�PYfMSiW ARRYW1yCF SECIbk i'- hY .1tttfC(L A'ti4 it:✓t tR3)P', fA:Q t(% ( (' U nfA tt, Z .(i(cyyElY,Wry tk..lrnxfsdi Atv"<h'C�'( =l T.E=r(%'i T:fl'A it:(UY:{#f.<fi StS'gYr t.Nl�E'/. IV. .(g12•Nt.. A�t.'U.4S Ctt)S.Lt»..t'T.FAt:I YO /�1� b 3t11 ' R '+ > <[IM tCN A2RR StW'=IttSST(TdY2R(X'IRSOUnPACSTW FErt�SWY US2CIMl(+UPRUi iq 0 A to RH 7t7NIC26 :€E �� 274t.R fHL.raST.r;J ur+xx;=XNf�a,xt.IGY.ES2 n,�vrr. .i14:c zt.mnar,4laxc<a� �/2VS N 1wi.•. [ SVlkc3'F 4[:JAY. r;orr..t7rairc G f 0 E'Ai,E4L'k1S5 NL'v'>t1Y Yf "' - i m E SS-- .��Y£YYSP#ht'a T i ANv CivU ': IOut tIhlM '^^.�• V+ A� E3�Yl_TON 6. MChK Ih3C YY ............F. I E ATTACHMENT D: LUPP MAP [EXCERPT] ..., RI RPORT RD Government( =: Hi9hY Orler`tec! 69 Airport Commercial Low-Density - Residential KITTY i�fAU47K DR —_ ICp ... 4 s RU6'Y_CIFt ©N4K_ST � M", t � .: "A ' ALMS c 3 CRYST T HiQ n gh Y � � Resldentlal ° OPAL CIR -� Igpi L ^ .;.. a , Resi�fentlal SEWELDR _. Ld i ? �E G ; d 5 ma's t 4 run) i r"} !Hlghvuay, ;, f�' ,. Orlentedl i -Law Density Commercial 11 Resla'niial LU ti Ltl 3 EAG/PDEN DR 1 = w " 1 IEhJ.ft+_1ARIL RD j ffLLLLt Legend Ames City Limits es- Feet 16 ATTACHMENT E: RH SITE EVALUATION MATRIX g RH Slte Evaluation Matrix Project Gonslst"-II High Average Low Locatiorv/Surroundings Integrates into an existing neighborhood with appropriate interfaces and transitions High=part of a neighborhood, no significant physical barriers, includes transitions; Average=adjacent to neighborhood, some physical barriers, minor transitions; Low=separated from an residential existing area, physical barriers, no transitions available X Located near daily services and amenities (school, park,variety of commercial) High=Walk 10 minutes to range of service; Average=10 to 20 minutes to range of service; Low=Walk in excess of 20 minutes to range of service. *Parks and Recreation has specific service objectives for park proximity to residential X Creates new neighborhood, not an isolated project (If not part of neighborhood, Does it create a critical mass or identifiable place, support to provide more services?) X Located near employment centers or ISU Campus (High=10 minute bike/walk or 5 minute drive; Average is 20 minute walk or 15 minute drive; Low=exceeds 15 minute drive or no walkability) X Site i Contains no substantial natural features on the site (woodlands,wetlands, waterways) X Located outside of the Floodway Fringe X Separated adequately from adjacent noise, business operations, air quality(trains, highways, industrial uses, airport approach) X Ability to preserve or sustain natural features X Hm sing Types and Design I Needed housing or building type or variety of housing types X Architectural interest and character X Site design for landscape buffering X Includes affordable housing (Low and Moderate Income)) X 17 ........ __............ .......Tramporta ... sion i Adjacent to CyRide line to employment/campus High=majority of site is 1/8 miles walk from bus stop; Average= majority of site 1/4 mile walk from bus stop; X Low= majority of site exceeds 1/4 miles walk from bus stop. CyRide service has adequate schedule and capacity High=seating capacity at peak times with schedule for full service Average=seating capacity at peak times with limited schedule X Low=either no capacity for peak trips or schedule does not provide reliable service Pedestrian and Bike path or lanes with connectivity to neighborhood or commute X Roadway capacity and intersection operations(existing and planned at LOS C) X X Site access and safety public Utilities/Services I � Adequate storm,water, sewer capacity for intensification High=infrastructure in place with high capacity Average=infrastructure located nearby, developer obligation to extend and serve Low=system capacity is low, major extension needed or requires unplanned city X participation in cost. Consistent with emergency response goals High=Fire average response time less than 3 minutes Average=Fire average response time within 3-5 minutes Low=Fire average response time exceeds 5 minutes,or projected substantial X increase in service calls I nstment/Cta ly'st Support prior City sponsored neighborhood/district investments or sub-area X planning X Creates character/identity/sense of place Encourages economic development or diversification of retail commercial (Mixed X Use Development) 18