HomeMy WebLinkAboutA004 - Council Action Form dated March 18, 2014 ITEM # 1
DATE: 03-18-14
COUNCIL ACTION FORM
SUBJECT: ESTABLISHMENT OF PUBLIC HEARING DATES
FOR GRANT AVENUE WATER AND SANITARY SEWER
CONNECTION DISTRICTS
BACKGROUND:
Since 2009 the City has been working with developers, land owners, and current
residents within the northern growth area to plan for the installation of public
infrastructure to serve this area. The northern growth area, generally located north of
Bloomington Heights Subdivision to W. 190t" Street between the UPRR tracks and Ada
Hayden Heritage Park, has been identified by the Council for residential development.
To facilitate this growth, Council directed that the water main and sanitary sewer main
extensions to serve this area be included in the 2012/13 Capital Improvements Plan and
Budget. The 2014/15 Capital Improvements Plan also includes the street paving of
Grant Avenue. The City will up-front the costs to design and install each of these
improvements. Utility connection districts will be established to recover the utility costs
as developments are platted and as existing homesteads connect to these mains.
Street construction costs will be shared and recovered through a separate special
assessment district. The annexation agreements previously signed between the City
and the three developers (Rose Prairie, Quarry Estates and Hunziker) confirmed these
financing arrangements.
When a city chooses to install utilities abutting undeveloped properties, it may establish
connection districts to recoup construction costs through fees collected at the time utility
service is requested. This process is authorized under Iowa Code, Section 384.38(3).
This Council Action Form initiates these processes for the water and sanitary sewer
main extensions to be bid and constructed this year. The planned schedule for the
bidding process is as follows:
March 25 Council approves Plans & Specifications
April 16 Project Bid Letting
April 22 Report of Bids, Approval of Final Plans and Specifications,
and Award of Bid
The proposed sanitary sewer connection district of approximately 741 .59 acres is
shown in Attachment A along with the property owners who will be served by this main.
The estimated fee for all parcels shown in Attachment A is $1,641.36 per acre. Parcels
6, 7, 8 and 9 have an additional estimated connection fee of $1,204.80 per acre, since
this section of main will only serve those parcels. Parcel 16 has an additional estimated
1
connection fee of $1,341.53, since this section of sanitary sewer main only serves this
one parcel.
The proposed water connection district of approximately 410.88 acres is shown in
Attachment B, along with the property owners that are to be served by this main. The
estimated connection fee for water main improvements is $1,084.24 per acre.
The general locations of the water and sanitary sewer mains are shown in Attachment
C.
After up-fronting the expense of installing these water and sewer mains, the City will be
reimbursed as development occurs and as existing homeowners connect to the utilities.
The Rose Prairie, Quarry Estates and Hunziker annexation agreements specify that the
developers will, upon approval of each final plat, pay a connection fee for the "benefitted
area" included in that plat. After ten years, the next final plat will trigger repayment of
any remaining balance.
During annexation discussions with the existing residents along Grant Avenue, concern
was expressed regarding their high "per acre" water and sewer connection costs.
Council authorized staff to offer a one-time "in town" connection fee (presently $1,440
per utility) for each existing homestead if the property owners would voluntarily annex.
The remaining balance of any connection fee would then be paid only if another
connection was later requested due to subdivision of their residential property. To date,
only two property owners have agreed to the voluntary annexation and the offer of
reduced initial connection fees. Separate agreements approved by Council have
confirmed those arrangements.
Two final notes are in order. First, no City property is included in the water or sewer
connection districts, since no facilities will be constructed in Ada Hayden Park that
requires water or sewer service. Second, the Rose Prairie annexation agreement
contemplates two other sewer connection districts to partially reimburse Rose Prairie for
the cost of extending sewer across their property to serve future growth to the west and
north. Since Rose Prairie has not yet initiated development, those extensions are not
being constructed nor are those connection districts established at this time.
ALTERNATIVES:
1. Set a public hearing date of April 8, 2014 for establishment of water and sanitary
sewer connection districts in the northern growth area; and direct the City
Attorney to prepare ordinances to establish these districts and to recover the City
costs that will be spent to install utilities as the properties are developed.
2. Delay setting the public hearing to establish these utility connection districts.
2
MANAGER'S RECOMMENDED ACTION:
By initiating the process to establish these two utility connection districts, Council will set
in motion the means for the City to recover the costs of installing the new water and
sewer mains. The projects can thus be bid, awarded and constructed during the 2014
construction season.
Therefore, it is the recommendation of the City Manger that the Council adopt
Alternative No. 1 as described above.
3
W 7YU 1 ST
13
1 - 10
Grant Avenue 6 • 7 r
Sanitary Sewer
Connection District (#1)
Attachment A
18
14
16
_ _ �►�'� ���i�i�i�i�iOi�i� �''�'i�
HARRISON RD
����ia�,��t������ �! �- ---ter ��. � '� `..ate 4....•.P• .� �' 'f� '-'rlp�rt''� �
'��'I .[A `',-����Rl�fl ����� .�. _`� '�_h\fir - il,\ s�`'®��!viGl�£��:�1�,��'��f��:'�1�1��` , ���..���`7.dIN.:, �'��O/, F✓l _1�'� I�� I_1
Sanitary Sewer Connection District #1*
Parcel Owner Parcel Owner
1 Roger and Lori Hamblin 10 Sansgaard Group
2 Clayton Gregg and Julie Schwery 11 Ames Community Bank
3 Paul and Margot Eness 12 Citicasters Group
4 Mark Taylor and Allison Eness 13 Ames Golf and Country Club
5 Paul and Margot Eness 14 Joshua and Rachel Mack
6 Hunziker Land Development 15 Borgmeyer
Erben and Margaret
7 Harold and Betty Frame 16 Hunziker
8 Brian Frame 17 Sansgaard Group
9 Quarry Estates 18 Leroy and Sue Sturges
*UPRR is NOT a part of the Connection District
I
W 190TH ST _
WM
10
Grant Avenue
w Sanitary Sewer
(#2)Connection District " ,
W Attachment A
o 18
-
r
14 -
_ t� 17 __ 4
16 -
1 2 �
w
'� - --- �C r • %CLAKESIDE.DR
IWATERBURY CIR l
��,iUllSlkN,noolin .L
� All-
r� �1ii' qd,f`c � +.• �� '_ mod•+
;WESTfN'DR- DANBURY-RD•`+�►, ON��-`�� caC�'f` � A'�i�l i /��
ry �'
F3 �* e
Sanitary Sewer Connection District #2
Parcel Owner
6 Hunziker Land Development
7 Harold and Betty Frame
8 Brian Frame
9 Quarry Estates
L
OM
W 190TH ST
• 12 11 — ate
10
Grant Avenue
w Sanitary Sewer x�
Connection District (#3)
63 W Attachment A
o 18
M. M
14
17 4
16 3
WATERBURYCIR
all
WA
NW Z�', SON�� '21 � ► ���Li;� ��''�j, „• ��. . !�"w`
;JJwres��dd��P✓��� E�l� li�p"��''.� k, ���� R`. .s�!s �,P�`�� ,e� :- � e�•'�� �•-'.'�`�:-i►'��,��;`;
';BURY-Rd ��` : .�� <,��/,/�IA�p � �■r7j ® ,�- ;�
I'II�--- Q.� t�l�lie!l4��'•�; _. _.a ll_-1_ti\ �'a. "'� �. .._... v.r.,iFfOF�.r�si �� t�W .:.�1'�t�1_.�!
Sanitary Sewer Connection District #3*
Parcel Owner
16 Erben and Margaret Hunziker
*UPRR is NOT a part of the Connection District
___
12 M 11EL
�� Ii■
13
10
49
,t�1•' �( - t► ,-.�.,.�`.., -a it� �' _
a.
Grant Avenue
Y - Water Connection District
Attachment B
L �—
a / II II 18
17
15 'N t
16 '"' 3
Ilk— �` .i-�.�����- . — �` --- _ -HARRISONMD
r 7 1141PR 4 1 MPIR"Ell-ee OF r ';C "� w\��• �1�C�1�. �Y _ �""�� 1'1:a'`j �,�'��111�1!
� '�P��-I��I�I���I�����wi�t t. `.•�', r ;.. �1 - �•' - ;,, ',�' � r:+i�pi�ill�D�
l� ��1�� r
� ������' IMP`].«�Rli1��. N —� �J�',�,�� �����'�� '��,�� � ,,� • • - -
:WESTON'DR-- � �
m�eeww�P
�'�wlww/Y[9�..-A�il�]I'Slr _ "11� OW A, �..
Attachment B (Cont.)
Water Connection District
1 Roger and Lori Hamblin
2 Clayton Gregg and Julie Schwery
3 Paul and Margot Eness
4 Mark Taylor and Allison Eness
5 Paul and Margot Eness
6 Hunziker Land Development
7 Harold and Betty Frame
8 Brian Frame
9 Quarry Estates
10 Sansgaard Group
16 Erben and Margaret Hunziker
17 Sansgaard Group
18 Leroy and Sue Sturges
Q
J I
V
W 190TM ST W 1901H ST
8" Sanitary Sewer
•;t '"''` �'' 12" Water Main Serving Connection
'�- 13 Y, District #2
,. I-
ti 1 o i 8
' Grant Avenue
Utilities Location Map .. ..
- 16 & 18 Sanitary Sewer
t14 4 5 Attachment C Serving Connection
--_ W _ �, - • District #2
14 15 $" Sanitary Sewer _ - -►+'
Serving Connection 17 Q 4
District #3 "
` ! 16 3
d%
IJ
'1` '► � ��'�` AKESIDE.DR
1 '� .�sl��irl�YiilI�Y����L7�� -A.<. ` � ors V •,C_;_� i �� �• �t
ij
fjt :WEN'DK�1��\�E1,, Aii�!__*N� �,-. i, ��,r��� �� `SoN� ;�� � ` ���yN��`,+1��;� ��. ,•/rya/
,w J�, t�MF.�Il l� <AA► �`` Pia ' .�a,Z: ; `�M 1� . ��j��
LUMP �!!ell����;�rr'/�1� ����a�������� w�a�� ����f sue, ,F��� f��ri-��� �,nZT-`� «�11�'�! ����,� �i���l�,►. ��! !'si.��
s. �MwdML. �� r�lir �c E', :.�b� ��. .vQ- L'i�