Loading...
HomeMy WebLinkAboutA007 - Council Action form dated August 12, 2003 ITEM # 350LY DATE: 08/12/03 COUNCIL ACTION FORM SUBJECT: APPROVAL OF THE MASTER PLAN AND REZONING OF KINYON AND CLARK PROPERTIES. BACKGROUND: The developers have submitted a request to approve a Master Plan for residential development under the Suburban Residential regulations and to rezone the proposed Kinyon and Clark properties from "A" (Agricultural) to "F-S RL" (Suburban Residential Low Density). This property is comprised of approximately 19.40 acres and is generally located south of Adams Street, north of Top-O-Hollow, east of Stone Brooke Subdivision, and west of Windsor Oaks Senior Living Facility. A total of 37 single-family detached lots and 10 single-family attached lots are proposed. The Master Plan indicates that there will be a net density of 3.93 units per acre for the proposed single-family attached and detached development. Concurrent with this request, the developers are also seeking approval of a Preliminary Plat that includes this subject area. The Preliminary Plat cannot be approved unless this Master Plan is approved and the property is rezoned. ANALYSIS: Existing Land Use. The subject property is currently undeveloped with the exception of a barn that will remain for the First Addition of the proposed development. The applicant has indicated that the house and barn will be removed at the time of development of the Second Addition in the distant future. The land to the east and west is mostly comprised of single-family attached and detached residential units.A senior living facility and synagogue is also located east of the subject property. Single-family detached land uses are located north and south of the subject area. Proposed Land Use. The developers are proposing to develop 37 lots for single-family detached units and 10 lots for single-family attached units. There existing wooded areas, creek, and natural sloping areas will be used as privately owned open space. Land Use Policy Plan (LUPP). The subject property is designated as "Village/Suburban Residential" on the Future Land Use Policy Plan Map. In this case, the developers have chosen to develop this site as a suburban residential development with low density residential base zoning. Therefore, the proposed zone change to "F-S RL" is consistent with the LUPP designation. (See map titled "Land Use Policy Plan".) r Zoning. This site is currently zoned "A" (Agricultural), which is the zoning that was applied to it when the property was annexed into the City. The developers/land owners are making a request to rezone this site to "F-S RL" (Suburban Residential Low Density). The vacant areas east and west of the proposal will remain agricultural. These areas consist of remnant land parcels associated with the single-family parcels along and north of Top-O-Hollow Road. The rest of the area surrounding the subject area is zoned Residential Low Density. Stone Brooke Subdivision to the east of the subject property maintains a base zone of Residential Low Density, but is also zoned as a Planned Residence District (F-PRD). Water. An 8-inch water main runs east and west along Adams Street. Additionally, a 12-inch water main runs east and west along Top-O-Hollow Road. The proposed development will create a loop between these services, which is beneficial to the City's water system. The subject property can be adequately served by municipal water infrastructure. Sanitary Sewer. A 12-inch sanitary sewer runs through the site. Proposed infrastructure improvements can be adequately served by this existing sewer infrastructure. Storm Sewer. A 60-inch storm sewer is located in the southeastern portion of the subject area and moves storm water into the creek that bisects the area east to west. Any new development on the subject property will require that storm water run-off be collected and controlled through a system of surface drainage, subsurface sewers, and/or storm water detention facilities. The rate of storm water run-off will not be increased above the pre-development rate of run-off. Any proposed development within the subject area will require the applicant to submit a site plan and staff will review a storm water management plan before the approval of subdivision plats or zoning permits. Access/Streets. The subject property will have access to Adams Street, Top-O-Hollow, and Hoover Avenue. Hoover Avenue will be extended from the south of the subject area where Top-Hollow intersects Hoover Avenue to Adams Street. The extension of Adams Street will provide for adequate access to the City's street network, improve vehicular circulation, and enhance pedestrian movement throughout the site. Fire. The estimated fire response time to the subject area ranges from four to five minutes. The City's goal is to have a fire response time of five minutes. The subject area falls within the City's response time goal. 2 Suburban Residential Development Principles. Property that is developed according to the Suburban Residential requirements shall create a development pattern that adheres to the following development principles: (a) A development pattern that contains generally distinct and homogeneous land uses. This development is to occur in the remaining in-fill areas and the targeted growth areas where the property owner does not select Village Residential development. ■ The developers are intending to develop this site with bi-attached and detached single-family residential uses. The majority of the property is proposed for single-family detached homes. The northwestern portion of the subject area is reserved for bi-attached single-family units, following the land use pattern of Stone Brooke Subdivision to the west. The interior area and area adjacent to the development along Top-O-Hollow Road is proposed detached single-family residential. This development pattern will establish a distinct and homogeneous character in the neighborhood, and will also provide a suitable transition between the existing and proposed land uses. (b) An economic and efficient subdivision design with respect to the provision of streets, utilities, and community facilities with limited focus on building and development design integration and greater emphasis on vehicular mobility. ■ The developers have submitted a Master Plan and Preliminary Plat that represent an economic and efficient subdivision design that allows for larger and smaller lots for single-family attached and detached residential units. The single-family detached homes on this site will be built conventionally without design criteria. (c) Effective landscape buffers between distinctly different land uses. ■ The proposed land uses are similar to adjacent land uses. Therefore, additional landscaping is not required. However, existing vegetation and oblique topography provides some buffering from the proposed development and established residential areas. (d) The provision of common open space in residential areas, where the maintenance of the open space is the responsibility of those directly benefiting. ■ Open space will be provided along the sloping areas and creek that runs east and west through the subject area. (e) A development pattern that ensures compatibility in the design of buildings with respect to placement along the street, spacing, and building height; and provides for spaciousness and effective vehicular and pedestrian circulation. ■ The single-family attached and detached homes will be developed conventionally and will meet the setbacks and height requirements that are prescribed by the Zoning Ordinance. This site design allows for spaciousness and effective vehicular and pedestrian circulation. 3 (f) A development pattern that is compatible with the surrounding neighborhoods and is consistent with the Goals and Objectives of the Land Use Policy Plan. ■ The adjacent neighborhoods are a mix of detached and attached single-family homes. The proposed plan provides for single-family detached development at the perimeter of the site, adjacent to existing attached residences. Proposed single-family detached will be adjacent to existing single-family detached land uses. This pattern of development allows for an effective combination of single-family residential development that is compatible with the surrounding neighborhoods. ■ The proposed plan is compatible with the goals and objectives of the Land Use Policy Plan (LUPP). The development proposal fulfills the goal of efficient infill development and meets suburban residential requirements. ■ The proposed development provides housing choice. Suburban Regulations. (a) Minimum Density. The Zoning Ordinance requires the minimum density in areas zoned "F-S RL" to be 3.75 dwelling units per net acre. The overall net density for the area zoned "F-S RL" is 3.93 units per acre. (b) Lot and Block Design. The Ordinance states that block lengths that exceed 660 feet on a block face shall contain a mid-block cut through or cross walk to enable effective pedestrian movement through the block. ■ The proposed development meets lot and block design standards. (c) Open Space Requirements. A minimum of 10%of the gross area shall be devoted to private or public open space. The ownership and maintenance responsibility of the open space shall be a Homeowner's Association or similar private entity. ■ The storm water easement areas and private impervious surfaces associated with undeveloped lots account for the minimum of 10% gross area devoted to open space. (d) Landscape Buffer Requirement. A landscaped buffer of 10 feet in width shall be provided in the setback area of any lot zoned "SRMD" where the lot is adjacent to any lot zoned "SRLD". The landscaping shall adhere to the L3 High Screen standards as provided for in Section 29.403. ■ The developer is only proposing Suburban Residential Low Density. This standard does not apply. 4 (e) Parking Requirements. Parking shall be provided to meet the requirement as set forth in Section 29.406 of this Ordinance. ■ All of the residential development on this site will meet the parking requirements of the City. Parking requirements will be checked as part of the Building Permit process. RECOMMENDATION OF THE PLANNING & ZONING COMMISSION: The Planning & Zoning Commission recommended approval of this rezoning request at their meeting of July 16, 2003 with the following recommendations: 1. That the rezoning and approval of the Master Plan shall be contingent upon a Development Agreement being worked out prior to City Council Action. 2. That the approval of the rezoning shall be contingent upon approval of the Preliminary Plat for the Kinyon and Clark properties. ALTERNATIVES: 1. The City Council can approve the Master Plan and rezoning for the proposed Kinyon and Clark properties from "A" (Agricultural) to "F-S RL" (Suburban Residential Low Density) as shown on the attached map with two stipulations. 2. The City Council can deny the Master Plan and rezoning for the proposed Kinyon and Clark properties from "A" (Agricultural) to "F-S RU (Suburban Residential Low Density) as shown on the attached map with two stipulations. 3. Action on this request can be postponed and referred back to City staff and/or the applicant for additional information. 5 MANAGER'S RECOMMENDED ACTION: The developer has submitted a Master Plan for this site that meets the requirements of the Suburban Residential zone and this site can be served by existing infrastructure. Therefore, staff believes the rezoning should be approved with the following stipulations: 1. That the rezoning and approval of the Master Plan shall be contingent upon a Development Agreement being worked out prior to City Council approval of the Preliminary Plat. 2. That the approval of the rezoning shall be contingent upon approval of the Preliminary Plat for the Kinyon and Clark properties. It is recommended that Alternative #1 be adopted. This will approve the Master Plan and rezoning of the proposed Kinyon and Clark properties from "A" (Agricultural) "F-S RU (Suburban Residential Low Density). This action will allow the development of the Kinyon and Clark properties. COUNCIL ACTION: Attachment 6 1 �g 1 a � 1 , s � A s L r t v � NINE I Existing Zoning Map Be SUBJECT AREA 1 50100 20Q ■ ■ Feet Prepared by the Department of Planning and Housing .• July 8, 2003 � �� �" � »c � e�'y`�F3 r(\a3"•ti�"`� - ;F: K � � 5 �aiz���. �$* L'�'�'� A �` �' ,�`�.. �y,4'" Ld toNO R ; Environmentally Sensitive Land -V� �, �� Ni 3a.z 51 wwau aul b 7 � - rr�yy 5A4a z£ t [. y,3 §� ZtJ `� g. : "r»' '�ga3,kx "� r ,g) a a•, LLl _�•- Q va {, 1 ■ fir° 2 j �'•!;ka qw b a �. - 2a' ! a �', ��` � ��O r.� �'kJ q�`y &�� `' �a �� +r ��.� iL���� �3 s' k"' � � � x€� a� 3•:��,'� '€ i. ��� x ...... Village/Suburban Residential , �c "ki � ..�{'�-''•`x � �,. :•FL, i^s '^ Et F §. •S` 3 �* 4 �`"a' `'.c Aa y r`�' '� "� < Mgt r r� a3 i a MON Low Density Res idential� p a r€ 7 r ® `' +a [:E�za. ",s•F' r• . F' s. 1 � vru � �a? c� i r w. e r �@ ) 0 r € x N Existing Land Use Policy Plan Map � W E SUBJECT AREA S 0 50100 200 mo� eet Prepared by the Department of Planning and Housing Map Created: July 8, 2003 • /// NE CORNER,S S 9, � KARL CLARK'S SVB, FOUND 1'PIPE NW CORNER,LOT 9. Z us[N[KI KARL CLARK'S SUB. < FOUND 1/2'REBAR W 5 '12"W 327.24 W/YELLOW CAP 06586 N89'19'45"E 548. arc. As s.e.6 REC AS 327.5' h -- r Lz ADAMS 5- T. PARCEL "SW CORNER $ _ // SEC ii ei�2a PARCEL P Og 463.33' S89'35'72"W 1 FOUND P-K NAIL 0.10 ACRES f 1 UK[ l o eU.wuG uou5 I �I ]9J ]IYIJ fI I� 1 1 1 1 DORIS KINYON 1 I PARCEL C I 7'25 ACRES o~o EXISTING ZONE AG I 1 1 PROPOSED ZONE "FS—RL" 7°�q- 1 ryl SUBURBAN RESIDENTIAL io KARL & KARINE CLARK 1 5 PARCEL Q N �r°Py 31 6.57 ACRES 1 31 1 EXISTING ZONE AG 1 RECEIVED ` C PROPOSED ZONE "FS—RL" REVEiVED SUBURBAN RESIDENTIAL z z JUL 0 7 2003 F-PR I CITY OF AMES,IOWA 1 1 FDEPT.OF PLANNING&HOUSING 1 1 1 1 N89'20'14"E 552.83' °��6z KARL & KARINE CLARK NE CORNER,PARCEL'A' OF LOT 9.KARL CLARK'S 1 NW CORNER.PARCEL A' SUB..FOUND 1/2-REBAR 1 AG W - OF LOT 9, KARL CLARK'S W/YELLOW CAP/6586 O T'7 SUB_FOUND 1/2-REBAR N W/YELLOW CAP#6586 PARCEL A S. CORNERr I S. ,w 1/4, 0 2.82 ACRES sW 1/e.NE 1/4 ml EXISTING ZONE AG SEC,27 84-24 SET 1/2-REBAR W/YELLOW 1 PROPOSED ZONE"FS—RL" SE CORNER,LOT 9 CAP 16586 , KARL CLARK•S SUB. 1 FOUND CUT•%IN CONCRETE CULVERT 589'03'36"W 331.78' SW CORNER,LOT ROBERT & CARRIE CLARK DORIS KINYON KARL C1 R2-R w •-'MARK & DIANA FOUND I/2- EBA 0.60 ACRES PARCEL R WEBER W/YELLOW CAP#6 86 RL e 2.03 ACRES TOTAL RL 0.18 ACRES ROAD 1.85 ACRES NET r EXISTING ZONE RL M C6 PROPOSED ZONE "FS—RL" n w a in a 0 0 0 o SURVEY DESCRIPTIONS z PARCEL'A'(AMENDED)-(Existing Zoned AG,Proposed Zoned"FS-RL") Part of Lot 9 in Karl Clark's Subdivision,Story County,Iowa. CENTER PARCEL Q-(Existing Zoned AG,Proposed Zoned"FS-RL") FOUND zt Part of the West Quarter of the Southwest Quarter of the Northeast Quarter of Section 27, ND 1/1-/4- FOU REBAR E W/YELLOW Township 84 North,Range 24 West of the 51h P.M.,City of Ames,Story County,Iowa. CAP#8136 J TOP-u-HULLOW Parcel C-(Existing Zoned AG,Proposed Zoned"FS-RL") Part of Lot 9 in Karl Clark's Subdivision in the City of Ames,Story CountY,Iowa. �n a Parcel R-(Existing Zoned RL,Propsed Zoned"FS-RL") A parcel previously described as the South 379.5 feet of the West Quarter of the Southwest >I Quarter of the Northeast Quarter of Section 27,Township 84 North,Range 24 West of the 5th o P.M.,Ames,Story County,Iowa except the East 100.0 feet thereof. 0 50 Too SCALE REQUEST FOR REZONING FIGURE: 1 FOX Engineering Associates. Inc. KINYON - CLARK SUBDIVISION 1601 c"le.n Aepen Dd.e, style 101 KINYON & CLARK PROPERTIES REVISION "o. DATE Ame], Iowa 50010 Phone: 515 233-0000 FRIEDRICH DEVELOPMENT CORPORATION e n g I n e It I n q FAX 515 233-0103 AMES, IOWA DRAWN I PROLILCI N10.1 DATE SRS 5180-038 `7/7/03 NW CORNER // I// / I IO NE GOPHER,LOT 9, 9. SEC.27 e4 2'14 I/I / / KARLDCLARK•S OSUB. I I IN I I KARL CLARWS SUB. 1 I FOUND P-K NAK. rR6IERR lM[(M) /, / FOl1ND 1// REBAR I IU I FOUND 1'PIPE j I]'DRARuo[ / dip�y .p I W/YELLOW CAP/6586 I IQ I 1 I Ga[LWM iYAR9+.YALYE, sw,u)n [ IO= li g , Lot 41 ____Shea•_____________.*. li D II e.elo pJY 11 Y1 r'•-: T- ADAMS ST. .buneARre � — 1^,✓) 7 -c4�t ' [] EN[MlOC ll -— -xe y�-��.._ `' V .es 90 1 i i •eac,: r % ,aol / / I 'p1i I T a /r ' Lof 4119?'i IVhIYIJW� `�1 ", T Lrofa-61 r5r � / .o-' 10{_1- IY r a6103•,At:T?E' /, -9 31 tq.�1 lI ILe4(eq.H 11a,31'[.R 1/,D 1-q-1,117 ./11 4z.`9s `.11 + 11,l02 q.11 j j i r'i T / I _ 1 ', I ` —— � ,,• - /-Rim----7 � I•, t;`f/ - �� A T }`- ._5-..� x".` _=_i / r• • / -/. I - �.-/Lot-b .j , t•32Cti Rq. • 1 __;•_: I -1 - rl�-� �.t' .N^"f `• _-^�< __ Jam,i+� f-/ ��'. I _ y��' i I I 4 1.1 i L j v—_'_.i[-y I _... _ " � t ..c^l _ .1�-1 � - � , .ri,�yi • Lot -It e7 ,eta yy- 1; Lob' t 1 =q>ces iv+w 1 iq.lf IJ 9•a_•J N,a�a-( b• T{ 12 rgal i'_ �' ri 6of 66, 1.t a•.,y„[rYj.�iC'R� G �aE crTb�x �, / 7 - ,' -- IMr :' ):• ,i./ c-iI"r/1 • -.-esvr�- -r Ro9� v Arbo -' - - 7= � - ____' S.IF O'>tk`.R TNO•i1{J 1, -+7`M'- it j l _ d —i, ..�.. -�,- -_ :.� -' _� - �"_" DLO 7uOf 2Z eAo!d.1a.�.•I., \I �, Lta.1- �1=`=s' - .ove "L: - ) j'.'----- k_'--=_=__._ --[.R�.+R�\ ..e.tlx.�R,ir�-- - - '_- -._�"•fi� :'ial-=z1, • .f- i a1='L9.=' _ta7=��^1 _---_- - �"���`- `-�9: zo;o37-. n 3 Dots n -y p} .z �--T T-t-_ ^I7 It _ q. r`R:^ -11_. .�.:Jfls1-•.n S II S7_ _..NE Z`:IRNM PAFL,, - OF_ ae S.6 f.nxa�yFNi 3 1e.257 "b' ' _ _ * -L' `��o• KRA JANLI `;I-IARP ao£w1 I S-�. 4�a-;eot 43 Lot 4" 2 y,. p.3t"Anes% AG A6Y.at-%„c, I'- c _ .. nS.NW NE_R. �v '�1`.�Ai .- ^�� -1�-•' rOT-3,.. �.. ; ..�-wrRD_"J W CORIIER 37,,' /(4.r'� ``--18,laY" -��' r /O.e7. d•K it.J. ___ �- �'/''/ 1FJ� _ - �I Ill�rll�l� 1 `I 1 III I'g@'f' W 1 NEW 1/4 $ >wN C./4,x7-e4-4 f A0, 80� /I11N 1 I 1'�I 1 svn 7 11//x REBAR r �J '_ _`meµ... _.`o _ -_ __ J' ^ NCO, ' I r I IIIIII�1 I. 1 FI /TtLLOW ''% -'Y AP/6586 --'1� _-_e'•}'X ___ _ _ I I 1111 / 1 MI / .e. fi-t-- 'Ss__Oat/ot_ t (t1�r 1` �\ I4 89` 36 W 554.59 i ri i rtIi`, • „r�cx..o �_" _ /` Sl,llln`1�•1T II �.n�uitiwm to K RCNOV[' `-6f A I ,I/ _ SW CORNER,LOT 9 ' "-,d ♦ /1,'. KARL CLgR S SUB C NER,LOT 9, MAR.Y, dt CI.AfIA FOUND 1/76REBA ) I t-' CUT'LAR IN SUB. II 1 f.BER W/YELLOW CAP/6 86 /.I .0 CULVERT KIM & JANE] $HARP y� j N[TABLE cURYF TABIL RLum LENGTK BARINBMW G CURVE LENGTH RABIu]CW[LENGTH RADIUS a" [ n s)]R .. ♦^..V.q nmmn 1i,31 IT: cvy l un,un,w. QI 28 Rx1'R 7 Vo, N OF NOOYER IF NANr'. '•�.xo rzN..RlROw,xPNO.YN[W4[ KKn U— pWOON OS J 11 EA�NLr xoT Rrt "w♦]HEFT- •eIKw L[A«I .. rlAi/MASLfR r4N SS AFR'NO '� rt Kr.rtv ue,]/Aq[ ] SiRDRIOAANB[�NO]Kel CONTROL r4 CENTER I 1 YANOX A[[ SEC.27-B4-x 11 N CArtNRa tAa[a 6N T6repWNlC SIDtLC10Bttl •[]I'4-, FOUND 3/4-R ' J'I.- I..ImA.n ]11RY[T um ON CA YELLOW I ,a� 1 e CENTRa CAP 8138 I i I RPE ErtOi To CflITER RC 37-N-M GRG]]NB N R[WIW YRLeWCA1Nl,a RECEIVED a1' a a[KK/ab N.l76/.7x,/E.Isq.l7. •127.ga \I CDIIe !p aW COIIKR,lel•RAILL GIARR'!ma :✓ wpe.ee, rrEv..lm.0 JUL .. yw oNBu,nN[o..Kvwui[®e[ acu[ CITY OF AMES,IOWA DEPT.OF PLANNING&HOUSING o� PRELIMINARY PUT/ MASTER PUN TOR[R4In..n.v A...m. •�`m' `/' S KINYON-GIARR AIeBM]MlN .pl y,A„..P.�e.....,,in IRARN ]/o 9 RMTON!MRK fROP�UIIEa e�mEc,� EIIIEDPIGN eEV[LOrMPM RORANON ...i,. „,A .,[a]-R� lle0-OJB a� /.. V4 Summary of Neighborhood Meeting June 4, 2003, regarding Kinyon-Clark Development Attending: Bob Friedrich, Jr., Scott Renaud, Brian O'Connell, Paul Weigand, Jeff Benson and approximately 52 others, generally residents of the Top-O-Hollow, Stone Brooke and Windsor Oaks neighborhoods (see sign-up list). 1. Meeting began with introduction of representatives of developers, City of Ames, development property owners and Neighborhood Associations. 2. Scott Renaud presented an overview of the main features of this development as currently proposed (see attached plan). He stressed that this is a sketch plan and that many details need to be worked out and will be reviewed in public meetings during the City's development review process. 3. Paul Weigand reviewed the history leading up to the street alignments in this development. In the original plans for the Stone Brooke development, Fletcher continued to the east and could serve this development area. The City Council approved dropping that street alignment due to concerns about wetlands and other environmental issues. During the process to prepare the current city Transportation Plan,Harrison Road was proposed as an east-west route accessing the areas south of what is now Hayden Park. The City Council did not include this route in the final Transportation Plan. The Reserve development includes a connection to the proposed Kinyon-Clark development area from the north. 4. Paul Weigand further explained that the City believes a through connection to the south is important and that this is to be accommodated by extending Hoover Avenue north through the Kinyon property to the available connection to Adams Street in the Reserve. A minimum offset requirement in City standards of 280 feet from the existing Hoover Avenue to the south cannot be met within the available property; therefore a through connection is proposed at existing the Hoover and Top-O-Hollow intersection,with a slight skew,to minimize impacts to neighboring properties. 5. In response to a question, Scott Renaud described the large box culvert that would accommodate this street crossing the existing creek and said that otherwise the creek will remain as is. 6. Eugene Lund,representing the Top-O-Hollow Neighborhood Association, presented a list of concerns and desires of that neighborhood. In the discussion that followed, Scott Renaud went down the list point-by point providing information and clarifying concerns. During this discussion, various people who identified themselves as residents of Stone Brooke raised related questions and concerns. 1 7. Neighborhood Issues a. Quiet area with no large trucks routinely using TOH. No increase in trucks is expected due to residential land use proposed. Traffic noise will be similar to existing residential area because the distance separating the new streets from the surrounding homes will be similar to typical city blocks. b. Potential Traffic— TOH has lots of walkers and kids. Since all new traffic is expected to be local, traffic on Top-O-Hollow is not expected to change to a degree that will affect pedestrians. The new street will have sidewalks built on both sides. c. School bus (45) access to any cul-de-sac areas d. Fire truck and moving can access to cul-de-sac area e. Street outlets for deep cul-de-sacs. (only one access) For all three of these, a single cul-de-sac is proposed at about 600 feet long. The City discourages cul-de-sacs, so this is one of the issues not yet resolved. If included, cul-de-sac design standards of the City will accommodate fire trucks;busses do not typically enter cul-de-sacs. f. Intersection of Hoover and Top-O-Hollow is not of standard type (Explained reasons for skewed alignment in presentation.) g. Sidewalks not indicated, where? (Described as on both sides of all streets in presentation.) 8. Environmental issues a. Control of water runoff The City had a storm water study completed for the entire watershed of the lake in Hayden Park, which included this area under developed conditions. A wetland/storm water detention cell to be built north of the development has been designed to accommodate all of the storm water from this part of the watershed. b. Existing flooding issues Detailed design for storm water runoff for this development has not yet been done, but this development will not make the current runoff situation any worse. There was considerable discussion about the amount of water ponding upstream from this development and flowing in the creek through the development property. Described by some as a"raging torrent" during large storm events, some believe this has gotten worse as the areas has developed, including the Northern Lights project, and that the detention system in Northern Lights does not function properly. As this situation seems to result from conditions beyond this development, the City will investigate. c. Loss of vegetation The developer is trying to save as many trees as possible, especially the specimen trees at the front (south) of the Kinyon property. Tree at the back of the Kinyon site are less desirable. Most of any impact on the trees will be from building the box culvert for the street to cross the creek. A few trees may be lost if a sanitary sewer is connected to Stone Brooke, but this has not been decided yet. No trees should be lost on the Clark property. It is not in the developer's interest to remove trees, because of the cost. d. Erosion of creek Although discussion was described above on the source of perceived problems and impacts on the creek through the development, concern was expressed about substantial filling (ten feet deep or maybe more) that might reduce the stream capacity at the downstream end of the development. The toe slope of the largest fills will come to only 50 or 60 feet from the stream and thus should not affect its flood storage. 2 e. Environmental impact to Hallet's area The watershed study indicates that the planned storm water detention cell to be built to the north and other environmental improvements in Hayden Park should mitigate any impacts from this development on this area. 9. Master Zoning and Planning a. No pre-existing plan The plan concept was just recently completed and the neighbors had not seen it until this meeting. b. Housing density. Concerned that there is not enough off-street parking. No known written density rules? The City does have density standards in its Land Use Policy Plan and Zoning Ordinance. The density of this project as currently planned is just above the minimum density allowed. The on-street parking will be similar to most other areas of Ames. The town home lots are wider and deeper than most such lots in Ames, allowing more lineal feet of street curb per unit and the possibility of additional off-street parking, such as in the Ironwood Estates development on Ironwood Court in southwest Ames. c. No second street outlet for cul-de-sac This is one of the areas where the developer and City staff do not agree on the current design plan. The developer defended the proposed plan based on keep costs reasonable and the need to meet minimum density standards. The City prefers a through street to improve connectivity and options for future access to an undeveloped land parcel. 10. Included on the list of Top-0-Hollow neighborhood concerns were the following "Neighborhood desires"prepared before this meeting took place: a. Lower housing density. b. Squared up intersection,not trying to directly access Hoover c. Address and solve existing flooding and creek erosion problem. d. Do an environmental study with relationship to storm water and the creek, flooding, water run off and Hallets water shed area. e. Off street parking, fire truck and school bus access. f. Down sizes the width of the street. g. Address the increased storm water runoff that is possible with housing development. 11. In response to a question, it was pointed out that all of this property has already been annexed into the city of Ames. 12. In response to a question whether there could be smaller lots and more common open space with trails, Bob Friedrich, Jr. explained that the City's interest for pedestrian connection is in sidewalks along streets rather than public trail located along back lot lines. 13. City staff said that once a plan is submitted it will be reviewed by staff and it will placed on an agenda of the Planning and Zoning Commission. The City will send a notice to all property owners within 200 feet of the development property as well as to the representative of each neighborhood association within that area. Questions about the project can be directed to Bob Friedrich, Jr. at Friedrich Construction on east Lincoln Way or to Eric Jensen at the City of Ames Department of Planning and Housing. 3 John R. Klaus, City Attorney,515 Clark Avenue,Ames,Iowa 50010 (515)239-5146 ORDINANCE NO. AN ORDINANCE AMENDING THE OFFICIAL ZONING MAP OF THE CITY OF AMES,IOWA,AS PROVIDED FOR IN SECTION 29.301 OF THE MUNICIPAL CODE OF THE CITY OF AMES, IOWA, BY CHANGING THE BOUNDARIES OF THE DISTRICTS ESTABLISHED AND SHOWN ON SAID MAP AS PROVIDED IN SECTION 29.1506 OF THE MUNICIPAL CODE OF THE CITY OF AMES, IOWA; REPEALING ALL ORDINANCES AND PARTS OF ORDINANCES IN CONFLICT HEREWITH AND ESTABLISHING AN EFFECTIVE DATE BE IT HEREBY ORDAINED by the City Council of the City of Ames, Iowa; Section 1: The Official Zoning Map of the City of Ames, Iowa, as provided for in Section 29.301 of the Municipal Code of the City of Ames, Iowa, is amended by changing the boundaries of the districts established and shown on said Map in the manner authorized by Section 29.1506 of the Municipal Code of the City of Ames,Iowa, as follows: That the real estate generally located between Adams Street and Top-O-Hollow Road,east of Stone Brooke Subdivision and west of Windsor Oaks Senior Living Facility, is rezoned from "A" (Agricultural) to "FS-RL" (Suburban Residential Low Density). Real Estate Description - Parcel 'P': Part of the West Quarter of the Southwest Quarter of the Northeast Quarter of Section 27,Township 84 North, Range 24 West of the 5'P.M., City of Ames, Story County, Iowa, more particularly described as follows; Beginning at the Northeast Corner of the West Quarter of the Southwest Quarter of the Northeast Quarter of said Section 27; thence S0017'30"E, 44.01 feet along the east line of the West Quarter of the Southwest Quarter of the Northeast Quarter of said Section 27 to a point on a curve concave to the southeast having a radius of 25.00 feet,a central angle of 82°28'03"and being subtended by a chord which bears S60°27'52"W, 32.96 feet; thence westerly, southwesterly and southerly, 35.98 feet along said curve; thence S 19°13'51"W tangent to said curve,5.93 feet;thence N70°46'09"W,60.00 feet;thence N19°13'51"E, 48.27 feet to a point on the north line of the West Quarter of the Southwest Quarter of the Northeast Quarter of said Section 27; thence N89°35'12"E, 71.16 feet along said north line to the Point of Beginning, containing 0.10 acres. Parcel' ': Part of the West Quarter of the Southwest Quarter of the Northeast Quarter of Section 27, Township 84 North, Range 24 West of the 5' P.M., City of Ames, Story County, Iowa, more particularly described as follows; Commencing at the Northeast Corner of the West Quarter of the Southwest Quarter of the Northeast Quarter of said Section 27;thence SO°17'30"E,44.01 feet along the east line of the West Quarter of the Southwest Quarter of the Northeast Quarter of said Section 27 to the Point of Beginning, said point being on a curve concave to the southeast having a radius of 25.00 feet, a central angle of 82°28'03" and being subtended by a chord which bears S60°27'52"W, 32.96 feet; thence westerly, southwesterly and southerly, 35.98 feet along said curve; thence S 19°13'51"W tangent to said curve,5.93 feet;thence N70°46'09"W,60.00 feet;thence N19'13'51"E, 48.27 feet to a point on the north line of the West Quarter of the Southwest Quarter of the Northeast Quarter of said Section 27;thence S89°35'12"W,256.08 feet along said north line to the Northwest Corner of the Southwest Quarter of the Northeast Quarter of said Section 27; thence SO°00'14"W, 884.27 feet along the west line of the Southwest Quarter of the Northeast Quarter of said Section 27 to the Northwest Corner of the South 379.5 feet of the West Quarter of the Southwest Quarter of the Northeast Quarter of said Section 27; thence N88°46'37"E, 331.84 feet to the Southwest Corner of Lot 9 in Karl Clark's Subdivision in the City of Ames,Iowa;thence NO°17'30"W, 835.56 feet along the east line of the West Quarter of the Southwest Quarter of the Northeast Quarter of said Section 27 to the Point of Beginning, containing 6.57 acres. Parcel 'R': A parcel previously described as the South 379.5 feet of the West Quarter of the Southwest Quarter of the Northeast Quarter of Section 27, Township 84 North, Range 24 West of the 5' P.M., Ames, Story County, Iowa, except the East 100.0 feet thereof and being more particularly described as follows: Beginning at the Center of said Section 27; thence N00°00'14"E, 379.51 feet along the west line of the Northeast Quarter of said Section 27 to the Southwest Corner of Parcel Q of the Northeast Quarter of said Section 27;thence N88°46'37"E, 231.83 feet along the south line of said Parcel Q; thence S00°20'45"E, 379.31 feet to a point on the south line of the Northeast Quarter of said Section 27; thence S88°44'17"W, 234.15 feet to the point of beginning, containing 2.03 acres which includes 0.18 acres of existing public right-of-way. Parcel 'B': Part of Lot 9 in Karl Clark's Subdivision in the City of Ames, Story County,Iowa, more particularly described as follows; Beginning at the Northeast Corner of said Lot 9; thence SO°41'46"E, 62.46 feet along the east line of said Lot 9; thence S89°35'12"W, 463.33 feet to the beginning of a curve tangent to said line;thence westerly, 78.86 feet along the curve concave to the north, having a radius of 230.00 feet and a central angle of 19°38'39", and being subtended by a chord which bears N80°35'29"W, 78.47 feet; thence N70°46'09"W tangent to said curve, 5.08 feet to the beginning of a curve tangent to said line; thence westerly, 3.29 feet along the curve concave to the south, having a radius of 25.00 feet and a central angle of 7°31'57", and being subtended by a chord which bears N74°32'08"W, 3.28 feet to a point+on the west line of said Lot 9; thence N00 17'30"W, 44.01 feet along said west line to the Northwest Corner of said Lot 9; thence N89019'45"E, 548.20 feet along the north line of said Lot 9 to the Point of Beginning, containing 0.76 acres. Parcel 'C': Part of Lot 9 in Karl Clark's Subdivision in the City of Ames, Story County,Iowa,more particularly described as follows; Commencing at the Northeast Corner of said Lot 9; thence S0041'46"E, 62.46 feet along the east line of said Lot 9 to the Point of Beginning; thence S89035'12"W,463.33 feet to the beginning of a curve tangent to said line;thence westerly,78.86 feet along the curve concave to the north,having a radius of 230.00 feet and a central angle of 19038'39", and being subtended by a chord which bears N80°35'29"W,78.47 feet;thence N70°46'09"W tangent to said curve, 5.08 feet to the beginning of a curve tangent to said line; thence westerly, 3.29 feet along the curve concave to the south,having a radius of 25.00 feet and a central angle of 731'57 2 and being subtended by a chord which bears N74°32'08"W, 3.28 feet to a point on the west line of said Lot 9; thence SO°17'30"W, 611.24 feet along said west line to the Northwest Corner of Parcel 'A'of said Lot 9;thence N89°20'14"E,552.83 feet to the Northeast Corner of Parcel'A'of said Lot 9; thence NO°41'46"W, 592.85 feet along the east line of said Lot 9 to the Point of Beginning, containing 7.52 acres. Parcel 'A': (Amended) Part of Lot 9 in Karl Clark's Subdivision, Story County, Iowa, more particularly described as follows; Beginning at the Southeast corner of said Lot 9; thence S89003'36"W, 554.50 feet to the Southwest corner of said Lot 9; thence N00°00'00"E, 224.37 feet along the west line of said Lot 9; thence N89°37'21"E, 552.87 feet to the east line of said Lot 9; thence S00°24'35"E,218.93 feet along said east line to the point of beginning,containing 2.82 acres. Section 2: All other ordinances and parts of ordinances in conflict herewith are hereby repealed to the extent of such conflict. Section 3: This ordinance is in full force and effect from and after its adoption and publication as provided by law. ADOPTED THIS day of , 2003. Diane R. Voss, City Clerk Ted Tedesco, Mayor 3 ITEM # �� G DATE _8/12/03 COUNCIL ACTION FORM SUBJECT: APPROVAL OF THE DEVELOPMENT AGREEMENT PERTAINING TO THE SUBDIVISION PLATTING AND DEVELOPMENT OF LAND CALLED KINYON-CLARK SUBDIVISION BACKGROUND: The developers are requesting approval of a Preliminary Plat for a subdivision with 47 lots to be developed under Suburban Residential zoning. The total gross acreage included in this subdivision is 19.40 acres. It is located north of Top-O-Hollow Road, South of Adams Street and The Reserve Subdivision, east of the Stone Brooke Development, and West of Windsor Oaks Senior Living Facility. This property is located near the northern extent of the City and has been annexed within the past several years as part of the Ada Hayden Park annexation. This19.04 acre parcel represents an infill development opportunity where land resources exist within the City of Ames and residential development potential exist that can serve to further the goal of the City to make efficient use of land and infrastructure resources where capacity exists. As part of the review and decision process for the preliminary plat, a development agreement has been prepared that outlines the responsibilities of the developer and the City. This agreement is designed to fulfill the requirement of State Code section 354.8 and the requirement of the city subdivision regulations found at Section 23.304. The agreement indicates that the following responsibilities by the developer and the City. DEVELOPER RESPONSIBILITIES • Dedicate street right-of-way • Install infrastructure required by the subdivision regulations of the city including, water mains, sanitary sewer mains, storm sewer improvements, electric facilities, street, curb, sidewalk improvements, and all other improvements specified in the subdivision regulations of the City. • The developer shall reconstruct the intersection of Hoover and Top-0- Hollow to create a four way intersection per city specifications CITY RESPONSIBILITIES • Pay the developer for the cost of the intersection reconstruction at Hoover and Top-o-Hollow for that portion of the intersection work south of Top-o- Hollow. • Pay the developer for the extra cost of constructing Hoover Avenue to a 31- foot collector street section. The developer will be responsible for the cost associated with building Hoover Avenue as a normal local street. • Pay the developer for the extra cost associated with the extra length of the culvert under Hoover Avenue since Hoover Avenue is being constructed as a collector street, which is 31 feet wide. • Pay the developer for the extra cost to construct Hoover Avenue to a collector street status, which requires extra depth of asphalt. • Pay the cost to clean and restore the channel of the east/west waterway that runs through the Kinyon-Clark subdivision. This work will include the installation of riparian buffers designed to mitigate erosion and water degradation of Ada Hayden Park. Typically the City does not participate financially in the cost of developing residential subdivision, but in this case the justification for the city financial participation includes: 1. Development in this area results in infill which makes efficient use of existing infrastructure and it limits outward expansion. 2. Involvement in the extra cost of constructing the extra width and depth of Hoover Avenue is standard city policy. 3. Hoover Avenue is critical with respect to solving street continuity and circulation problems since it was decided by the City Council that Harrison Avenue would not be constructed along the south side of the Ada Hayden Park as a mean to accomplish improved street and traffic circulation in this area. 4. Participation by the City in improving the east/west waterway has direct benefit to the long-term quality of the water in Ada Hayden Park The source of funds that is recommended by staff to pay these costs is outlined in the following table. Kinyon-Clark Subdivision City Financial Participation Fund Source Activity Fund Source Cost Estimate Extra Width-Hoover Road Use Tax $12,000 Extra Depth-Hoover Road Use Tax $16,000 Extra Culvert length-Hoover Road Use Tax $12,000 Hoover/To -o-Hollow Intersection Road Use Tax $25,000 East/west Channel clean/restore Ada Hayden Park $20,000 Project proceeds TOTAL $85,000 2 (A copy of the Development Agreement is attached to this Action Form) ALTERNATIVES: 1. The City Council can approve the development Agreement for the Subdivision Platting and Development of Land called Kinyon-Clark subdivision. 2. The City Council can deny approval of the Development Agreement for the Subdivision Platting and Development of Land called Kinyon-Clark subdivision. 3. The City Council can refer this issue back to staff for additional information. MANAGER'S RECOMMENDED ACTION: The development of the Kinyon-Clark properties represents a very efficient development proposal utilizing property that truly can be defined as infill development. Currently, there exists sanitary sewer and water infrastructure, either on the property or immediately adjacent which results in a very efficient use of land resources and existing infrastructure. The proposed subdivision of the Kinyon-Clark property will include the construction of Hoover Avenue to Adams Street, which will serve to improve traffic circulation in this area of the City. The approach to managing storm water discharge should result in an improved condition for both, storm water quantity and quality management. As a result there are several public benefits that will be accomplished by the development of the area which justifies the financial participation in this development as outlined in the Action Form. Therefore, it is the recommendation of the City Manager that the City Council adopt Alterative #1. This will approve the Development Agreement for the Kinyon-Clark subdivision that includes city financial participation of approximately $85,000 from the fund sources identified above. 3 DO NOT WRITE IN THE SPACE ABOVE THIS LINE,RESERVED FOR RECORDER Prepared by: John R.Klaus,City of Ames Legal.Department,515 Clark Avenue,Ames,Iowa 50010(Phone: 515-239-5146) Address Tax Statement To:City of Ames,Iowa,515 Clark Avenue,Ames,Iowa 50010 AN AGREEMENT PERTAINING TO THE SUBDIVISION PLATTING AND DEVELOPMENT OF LAND IN THE CITY OF AMES CALLED KINYON-CLARK SUBDIVISION THIS AGREEMENT,made and entered into this day of ,2003, by and between the CITY OF AMES, IOWA (hereinafter called "City"); and Doris Kinyon, Karl Clark,Jr.and Karine Clark,and R. Friedrich &Sons, Inc.,their successors and assigns(hereinafter collectively called "Developer"). WITNESSETH THAT : WHEREAS,the parties hereto desire the improvement and development of an area legally described as set out on Appendix A, hereinafter called the "Site"; and, WHEREAS„ Developer has applied to the City for platting of subdivisions of the Site; and, WHEREAS, an agreement between the Developer and the City with respect to public improvements is required by the City as a condition to approval of subdivision plats pursuant to Section 354.8 Code of Iowa, and Section 23.304 of the Municipal Code of the City. NOW,THEREFORE, the parties hereto have agreed and do agree as follows: PURPOSE A. It is the purpose of this Agreement to: 1. Document, record, and give notice of, a certain plan of development, and the public and private measures and undertakings essential to the implementation of that plan of development, for the Site. Page 1 of 6 2. Provide remedies to the City in the event the said plan of development is not adhered to or achieved by the Developer. B. This Agreement does not create or vest in any person or organization other than the City any rights or cause of action with respect to any performance, obligation, plan, schedule or undertaking stated in this Agreement with respect to the Developer. This Agreement does not prevent the City from amending, modifying, or releasing the Developer from some or all of the provisions of this Agreement. No person shall have any cause of action or recourse against the City or Developer by reason of any such amendment, modification or release. 11 DURATION OF AGREEMENT Continuance of Developer's obligations pursuant to this Agreement are subject to and contingent upon approval by the City Council of the City of a final plat of what is shown on Appendix A, as prepared and submitted by Developer, in accordance with the applicable ordinances of the City, to have all occurred not later than the - day of 2003. III CITY'S REMEDIES A. In that the Developer seeks to persuade and induce the City to approve an official plat of the Site by presenting a plan for the development and improvement of the Site in its entirety, it is understood and agreed that the City shall not issue any building permits with respect to any place on the Site for which a final plat of subdivision has not been approved and filed for record. B. The City shall not issue a building permit, zoning permit, or any other permit of the City with respect to any excavation, construction, reconstruction or remodeling on the Site unless said work is undertaken in accordance with the provisions of this Agreement. C. The City shall not approve any final plat of any phase of development on the Site unless said plat is in accordance with and meets the provisions and conditions of this Agreement. D. All ordinances, regulations and policies of the City now existing or as may hereafter be enacted shall apply to activity on the Site. Page 2 of 6 IV PLATTING PROCESS The Developer shall undertake the official platting of subdivisions of the Site pursuant to the procedures established by the statutes of the State of Iowa and the ordinances of the City. The City may establish specific requirements for improvements of the Site, and require a performance bond or other security for the performance of improvements by the Developer. The requirements for improvements relative to the approval of the official plat of the Site may reiterate the provisions of this Agreement; and, may state additional required improvements. V IMPROVEMENTS A. Streets and Street Improvements. 1. The Developer shall,with respect to all streets as shown on the Site,convey fee title for the street land to the City at no charge or cost to the City, said conveyance to occur at the time of subdivision platting. 2. Intersection. The Developer shall, in accordance with the specifications of the city,reconstruct that part of the intersection of Hoover Avenue and Top-0-Hollow Road that lies south of the point where Hoover Avenue will connect to Top-0-Hollow Road. That work shall include, by way of specification but not limitation, any and all pavement, right-of-way acquisition, sidewalk construction, fire hydrant relocation, and electric utility pole relocation. The Developer shall reconstruct the storm sewer intake where HooverAvenue meets Top-0-Hollow Road,but that intake shall not be relocated. This work shall be contracted by the Developer through a competitive bid process and the City shall pay the cost of the work if the estimated cost of the work, as determined by the City's engineer, is less than $50,000. If the City's engineer estimates the cost of the work to be more than $50,000, the City shall contract and pay for the work in accordance with the Iowa statutes pertaining to public improvements by a City. 3. Culvert. The City shall pay up to but not more than 20% of the cost of a 72"culvert at the point where Hoover Avenue crosses a waterway; and, the City shall perform channel Page 3 of 6 cleaning and restoration work with respect to said waterway in an amount up to but not more than $20,000. The cost of the culvert includes pipe, aprons, apron end walls,and rip-rap at the inlet and outlet. The Developer shall dedicate to the City, at no cost to the City, an easement for the stream channel through the entire Site. 4. Extra Width. The City shall pay Developer's cost, based on bids received, for the extra five feet of paving width to give Hoover Avenue a paved roadway that is 31 feet wide instead of the customary and usual 26 feet in width. B. Water Main Improvements 1. The Developer shall show on the final plat, and grant to the City by executed instruments,without charge to the City,easements in a form acceptable to the City, for installation of required water mains on the Site. 2. The Developer shall install all water mains as specified by the City with respect to subdivision of the Site at the sole cost and expense of the Developer. C. Sanitary Sewer Improvements 1. The Developer shall show on the final plat, and grant to the City by executed instruments,without charge to the City, easements in a form acceptable to the City, for installation of required sanitary sewer mains. 2. The Developer shall install all required sanitary sewer mains with respect to subdivision of the Site. D. Storm Sewers and Storm Water Management 1. The Developer shall grant to the City, without charge, easements in a form acceptable to the City for installation of storm sewers and storm water detention facilities on the Site. 2. Developer shall install and construct all storm sewers, storm sewer appurtenances, and storm water detention basins, as specified for the Site by the City, at the sole cost and expense of the Developer, and at no cost or charge to the City, for the purpose of Page 4 of 6 managing both the quantity and quality of storm water discharge. E. Sidewalks. Developer shall cause sidewalks to be constructed to City specifications at the Developer's expense with respect to each platted lot as a principal building is completed on the lot, but not later than two years after approval of the plat of subdivision of the Site. With respect to the "Kinyon lot" on which a principal building now exists, the required sidewalk shall be completed not later than twenty-four months following the date of approval of the final plat of the Site. VI SECURITY The Developer shall install and dedicate to the City all public improvements required for approval of the plat of subdivision of the Site prior to approval of the final plat; or, execute an improvement agreement to guarantee the completion of all such required public improvements and provide to the City as security for the completion of that work an"improvement guaranty"as stated in Section 23.409 of the Municipal Code of the City of Ames, Iowa. VII COVENANT WITH THE LAND This Agreement shall run with the Site and shall be binding upon the Developer, its successors and assigns. However, this Agreement shall not be binding with respect to any officially platted lot for which a City building permit has been issued, except with respect to restrictions on access to certain lots from certain streets and roadways. Each party hereto agrees to cooperate with the other in executing a Memorandum of Agreement that may be recorded in place of this document. Page 5 of 6 IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed effective as of the date first above written. CITY OF AMES, IOWA STATE OF IOWA,STORY COUNTY ss: On this day of 2003, before me, a Notary Public in and for the State of Iowa, personally appeared Ted Tedesco and Diane R.Voss,to me personally By known, and,who, being by me duly sworn, did say that they are the Mayor and City Clerk, respectively, of the City of Ted Tedesco, Mayor Ames, Iowa;that the seal affixed to the foregoing instrument is the corporate seal of the corporation, and that the instrument was signed and sealed on behalf of the corporation, by authority of its City Council, as contained in Attest by: Resolution No. adopted by the City Council Diane R. Voss, City Clerk on the day of and that Ted Tedesco and Diane R. Voss acknowledged the execution of the instrument to be their voluntary act and deed and the voluntary act and deed of the corporation,by it voluntarily executed. Notary Public in and for the State of Iowa DEVELOPER By: Karine Clark By: Doris Kinyon STATE OF IOWA,STORY COUNTY ss: On this day of 2003,before me,a STATE OF IOWA,STORY COUNTY ss: Notary Public in and for the State of Iowa,personally appeared On this day of 2003,before me,a Karine Clark, to me known to be the person named in and who Notary Public in and for the State of Iowa, personally appeared executed the foregoing instrument, and acknowledged that she Doris Kinyon, to me known to be the person named in and who executed the same as her voluntary act and deed. executed the foregoing instrument, and acknowledged that she executed the same as her voluntary act and deed. Notary Public in and for the State of Iowa Notary Public in and for the State of Iowa By: By: Karl Clark, Jr. President, R. Friedrich & Sons, Inc. STATE OF IOWA,STORY COUNTY ss: STATE OF IOWA,STORY COUNTY ss: On this day of 120 On this day of 2003,before me,a before me, a Notary Public in and for the State of Iowa, Notary Public in and for the State of Iowa, personally appeared personally appeared ,to me personally Karl Clark,Jr.,to me known to be the person named in and who known,who being by me duly sworn, did say that that person is executed the foregoing instrument, and acknowledged that he president of said corporation, that the seal affixed to said instru- executed the same as his voluntary act and deed. ment is the seal of said corporation,or no seal has been procured by the said corporation,and that said instrument was signed and sealed on behalf of said corporation by authority of its board of Notary Public in and for the State of Iowa directors and the said acknowledged the execution of said instrument to be the voluntary act and deed of said corporation by it voluntarily executed. Notary Public in and for the State of Iowa Kinyon Clark Subdivision Ag=-080503.wpd Page 6 of 6 F- L2ORNER, LOT 9, N CLARK'S SUB. D 1" PIPE 15' DRAINAGE / NW CORNER, LOT 9, zz EASEMENT / KARL CLARK'S SUB. FOUND 1/2" REBAR S '12"W 327.24 W/YELLOW CAP #6586 N89-19'45"E 548. = � REC. AS 548 6' REC AS 327.5' u� PARCEL B r 4z ADAMS ST. NW CORNER 1 SW 1/4. PARCEL P S sus +? ` 463.33 S8�"= 1 FOUND P-K NAIL 0.10 ACRES 4E, i LINE LENGTH CHORD BEARING RADIUS L1 5,93 S19,1351 5.0e N701s6 D9 CI 35.9e S604928 25.00 C2 3.29 N74'3208 25.00 9. S 8 1 1 1 1 1 DORIS KINYON 1 PARCEL C 7.25 ACRES �P EXISTING ZONE AG 1 PROPOSED ZONE "FS—RL" �° 7 1 P �1 SUBURBAN RESIDENTIAL 1�\� Q 1 KARL & KARINE CLARK 1 .�� �, w o cCo V 00 PARCEL Q 0 �zoP� 31 6.57 ACRES 1 3 1 1 EXISTING ZONE AG o PROPOSED ZONE "FS—RL" Erna o o SUBURBAN RESIDENTIAL o o z V) lU(_ 0 '7 1003 F-PRD CITY OF AMES, IOWA 1 1 DEPT. OF PLANNING & HOUSING 1 N89'20'14"E 552.83' I< 17 2� Q 1 KARL & KARINE CLARK NE CORNER,PARCEL 'A' OF LOT 9,KARL CLARK'S 1 NW CORNER, PARCEL 'A' SUB., FOUND 1/2" REBAR AG w _ OF LOT 9, KARL CLARK'S W/ YELLOW CAP #6586 1 O I+') SUB- FOUND 1/2" REBAR N W/ YELLOW CAP #6586 PARCEL -A NW CORNER 795% W 1/4, O N 2.82 ACRES S.SW 1/4, NE 1/4 01 EXISTING ZONE AG SEC, 27-84-24 SET 1/2" REBAR PROPOSED ZONE"FS—RL" SE CORNER. O W/ YELLOW 1 KARL CLARK'SSUB. CAP #6586 FOUND CUT Y IN 1 CONCRETE CULVERT S89'03'36"W 331.78' ROBERT & SW LIz DORIS KINYON KARLOCLARK'SO UB CARRIE CLARK [,MARK & DIANA FOUND 1/2" REBAF 0.80 ACRES PARCEL R WEBER W/YELLOW CAP #6 86 RL Q 2.03 ACRES TOTAL RL 0.18 ACRES ROAD 1 .85 ACRES NET to EXISTING ZONE RL M M PROPOSED ZONE "FS—RL" M W W to 0 0 N 0 0 SURVEY DESCRIPTIONS z (N PARCEL W (AMENDED)-(Existing Zoned AG, Proposed Zoned "FS-RL") Part of Lot 9 in Karl Clark's Subdivision, Story County, Iowa. CENTER PARCEL Q-(Existing Zoned AG, Proposed Zoned "FS-RL") SEC. 3/4- REBAR FOUND 3/a" Part of the West Quarter of the Southwest Quarter of the Northeast Quarter of Section 27, W/ YELLOW Township 84 North, Range 24 West of the 5th P.M., City of Ames, Story County, Iowa. CAP #8136 TOP-0—HDLLOW Parcel C- (Existing Zoned AG, Proposed Zoned "FS-RL") r� r---� Part of Lot 9 in Karl Clark's Subdivision in the City of Ames, Story CountY, Iowa. Parcel R- (Existing Zoned RL, Propsed Zoned "IFS-RL") A parcel previously described as the South 379.5 feet of the West Quarter of the Southwest >� Quarter of the Northeast Quarter of Section 27, Township 84 North, Range 24 West of the 5th o P.M., Ames, Story County, Iowa except the East 100.0 feet thereof. n 0 50 100 lU' SALE 1 FOX Engineering Associates, Inc. REQUEST FOR REZONING FIGURE: 1601 Golden Aspen Drive, Suite 103 KINYON - CLARK SUBDIVISION NO. DATE Ames, Iowa 50010 KINYON & CLARK PROPERTIES REVISION Phone: 515 233-0000 FRIEDRICH DEVELOPMENT CORPORATION e n g i n e e r i n g FAX: 515 233-0103 AMES, IOWA DRAWN PROJECT NO. DATE SRS I 5180-03B 7/7/03ff WIN NAM BA PLOT SCALE SCRIPT FILE PLOT VIEW 1=1 MASTER PLA HASTE P NW CORNER �// / NW CORNER, LOT 9, I� I NE CORNER, L SUB .�---- SW 1/4, NE 1/4 / / KARL CLARK'S SUB. 1 1(n 1 SEC. 27-84- 4 FOUND 1 2" REBAR I I- 1 FOUND 1" PIPE FOUND P-K NAIL pROpERTY LINE(TYP /. / / I I U 1 W/YELLOW CAP #6586 3 15'ORAINAOE EQTTUEX/BTING / I I¢ SANITARY MANHOLE EASEMENT I� I / T '.VI��C� �(rp,'IN 1 RIM=93.24 FL(S)-7.77 f -r- -- 254.67 _ �I 1 / P•w TA = _°' VTR _ Lot 41 ! n� so'R.o.w. - ------�- -='sw'swa----♦ ( $ ,v 1 e- _ a• ADAMS ST.ui I G - _ E ' BOUNDARY - \ \N I - r e_ �c E T -T 1�-sct :86 - 78.87 _. r r,64.95 Ol 7 `80.01•/ i �' i 80.01 ; , 228.86 ij{CEL �;--4ti , ' i / / / / / ! I j o Lot 1 js K�r�YCTrv, ry" `, 7 /Lot '6,' Lm 5/ Lot' 4FL�t,'jj ` Lit,(23 19t -1 n 0.30,ac s �?>( RED D� \ I are 0.27/acr�a / 0. 1 6cr a O:32 aors ti Cc 0.30 q're0.26 acres AG /� / \ 1 \II \ o"� _o o° o 0 0 - _ N'4W ' f I ' l r r l ! '- /180.5$6"ar!` id Lot R200 ` 1arr.'a2z' wag' � M ,- Lot 38. /�° LOt- /i. $ (r __ -i- ✓ .! 0.26-.acres 0.18/bcni - I/ EAsmERr _- � _ IN t;�loas; 8-"..YdATER-' / r-I_�-+ 1` .'-'i- / L®t' %�; _,`\y3sx7 �"". �tj LOB_ L! ' cre3D 0.34.a6rea -agree, Or�28, C�rE` "Ot18'acre 055/ 77 - W 98' '.1-. 44.22' /a R 3.Q'WATER-EASEZA6P(T` X. - .4/ Il / ,' ' , ! R+evY -, --89.85 ' I 54.32' 3+005 R0 - g¢C)O� �; ' 1\ "-- I "2 S2 G4<.. c - ,Iy1\G \°�\ :g\\`\\\ LOf\ �' •' o = - a-_ O 22 _II --- -` --- - - t�-c� _-_-_' -E} r °o---EX 3-- ?p\\ c-PRO 'wig � f_,(.'1,,`�T 1-- L�- N � - `1- SANITARY MAfA10LE 60 ROW' `� J �.#6 cCres ¢44 aCr�a 0 acres IP _ II 42 acres- i _ \_` " 7-so 20 _ - I- ` J TAR:`MSNHOLE W _ __ ' �I \3\�9a- � "` tot- RIM-95.77_ _ `` a \ _ _ 0.53 croa 1 T- ` Ik` acres \L 1 _ - - - _ __ SI180,2 SAN __�lE-CORNERrRA40E6,-'+�- S Lot _ �--Q - -=-'I a.r' .ERi _-- Ear_ ----- -- '- -- OF�LOT_9 fCABI'- 3PMENT It 12)7t-i.721RCP CUL _ _ 0 0.35 a �� o %' -- KAi h* t5. t --____`._-,.' \�\\�1�'\ ; ^�-: CUP cULo2aT KIM & JANE? J.� 5 � ' -@ �O-��i � �ouFN9w1�h ,. SHARP Lot_3fi _ Q e 0 421 g t 43-' Lot 4 < X - \ 0.30 aere� v;" _ _ - ---\ �0. 033aAcre's 0.31 - GBt reB d �ftl Ilj AG --- / - - - - - 99 -- -137-.32' '"1 -9g9.- 933.71�_ _ _--Nw RNERKARLCE RK'S .!/ __-- t. lCG _ - _ -_ _ -- F �T 9, r - i I ---- .. G, - 1 w CORNER - -- LQI' -\ -i' I 379.5', W 1/4 L - - 0. 5 ' 04__ i .' /-i'. /' .' I /i 1 I it I 1 W 1/4 NE 1/4 _ EC. 27-84-24 _ ET 1/2" REBAR % - j' - - - ��\_ - - - ''Gp - / _ _ 1 11/ I`� L7Iw RN 99.9.WNHOLE / YELLow AP 6586 '121�3'. _ __ ag 0 '36"W 554.59�\, / 17J J t; _ 3 �,�. _ --. - - -, ��-'.,�'I I 1 I7 P<:P CULbT_RT SW CORNER, LOT 9 TO BE REMOVED - F. / , I ,C NER, LOT 9, j MARK & DIANA KARL C1/2- R SUB ARK'S SUB. ' FOUND 1/2" REBAR �! j 7�,� ! o.3a, WEBER w/YELLOWW CAP �!s as /'' cut x' w RL\ t TE CULVERT RL 1, ,, I , KIM & JANET - " / ! _ T PRELIMINARY PLAT DATA: SHARP `` LINE TABLE CURVE TABLE RL Qij- 40,0 - LINE LENGTH BEARING CURVE LENGTH RADIUS CURVE LENGTH RADIUS s0Bo1VIsION: KINYON-cLARK waovsoN F-- i'A,TO _ Ll 63.26 N33'33'09'E LI 83.N 240.00 C19 49.66 327SO OWICER: 00Po5 KINYON(PARCELS R d 0) LANDSCAPING I'7 - ( L2 16.48 S00'11'05'E C2 9.10 23" C20 20.66 327.50 AYES,iOWA SHOLLOW ROAD RAIL ROAD TIES - 1 ��� L3 54.32 S7B'3B'04'E C3 61.81 230.00 C21 2515 15.00 (TYP.) 111 ( 10 a l\' C,1 LA 52.04 S78'38'04'E C4 64,52 230.00 C22 18.07 17a.00 KARL'RED'CORK fPAROAD ARC) / L5 34A0 N84.38'03-E C5 21.97 15.Do C23 I01.97 170.00 AMES TOP-0-5HOLLOW ROAD Lb 27.34 N84.38'MYE C6 21.30 272.50 C24 B224 229.49 AMES,IOWA 50010 f` OEVEIOPEIt 619 E. Con.lruefl.n CFBS L7 4411 N89.5927•V C7 3.4a 327.50 C26 68.91 25.56 619 E.Unaoln Way I' LB 4422 N84.38'03'E co 39.42 327.50 C26 68.9t 230A0 Am.., ens SOOfO L9 17.12 N64.38'D3'E C9 56.21 327.50 C27 70.34 251.13 I I \ I ( L10 74.98 S78'38.04'E CIO 28.11 35.00 C28 32.74 22BA3 PLAN AUTHOR; SCOTT RENAUD,P.E. LLL 3L38 S70'38'01'E Clt 39.94 SSAO C29 10.71 230.00 1W1 GOLDEN ASPEN DRIVE,AMES,IOWA 500,0 L12 23.09 N10'16'19'E C12 40.91 55.00 C30 7215 230.00 (SIS)233-0000 L13 Lt.- N40.16'19'E C13 51.90 51 DO C31 61.54 230.00 (SIS)233-0103 FAX _ 6•� L14 40.13 N85'01'49-E C14 40.97 55.DO L32 76,49 111.11 CONTACT: SC0/T RENAUD.PF. 01 US 39.89 N83'OI'49'E CIS 59.32 SS,00 C33 23.61 170.00 ONO SURVEYOR:STUMBO a ASSOCIATES LAND SURVEYING,INC. L16 36.37 N40'I6'19'E C16 27.99 55.00 C34 19.95 300.00 510 SOUTH 17TH STREET, SURE 102 26.04 N00'1I'05'V C17 28ll 35.00 C35 114.58 111.11 AMES,IOWA 30010 R 5 y Q t O LIS 63.26 N33.33'09'E CI8 72.97 27Z50 C36 1626 230A0 (513)233-3668 \ 1 L E7 (513)233-4403 FAX �[L' C L19 25.03 N0024'33'V AS i+.Vs aCr81a \ Ta L20 24.00 XL-31'S2'V DESCRIPTION: PARCELS A,C OF LOT 9 2 I(ARL CURKS 5U9DIYISION OF THE NE 1/4 OF SEC 2]-5:ZA - L21 33.93 N01'05'04'E AND PARCELS R.e O OF THE W 1/4 OF THE SW 1/4 L22 56.33 NDS-35'loN .1 ! I L23 34.18 S00.08'18'E DATE PREPARED: Jun,TH.2003 R25' ii L24 20.00 N00'00'00E DATE REVISED: my 7,2003 1704j EX MIND ZONING: RL A AG M PROPOSED ZONING: 'F5-RL' N W CENTERLINE _r SIT��' PHASING NOTE e SETBACKS: Front Yard: 23' OF HOOVER,� _ - �f't \ r `� ALL CONSTRUCTION MATERIALS,DUMPSTERS,DETACHED LOTS 1-41 WILL BE DEVELOPED AT ONE TIME. Sid.Yard: 6'-On.Story -L', 4-. fr sue• TRAILERS OR SIMIUR ITEMS ARE PROHIBITED 01 PUBLIC LOTS 42-47 WILL NOT IMMEDIATELY BE DEVELOPED e'-Tro Story STREETS OR WITHIN THE PUBLIC RIGHT-OF-WAY. Rwr Yard: 25' �` LAND USAGE NOTE _.RliAb n8.41 PARKING REGULATIONS: LOTS 1-31, 42-47 SINGLE FAMILY NO PARKING ON E SIDE EDGEWATER DRIVE LOTS 32-41 TOWNHOME NO PARKING ON N SIDE KINYON COURT PROJECT DENSITY v "TAPPING NET DENSITY=3-93 UNITS/ACRE CENTER SEC. 27-84-2 t - I/ V SAND SLEEVE CONTOURS BASED ON TOPOORAPHIC NEW INTAKE -Ir� 'I SURVEY TAKEN ON 4/4/03 FOUND 3/4" RE � , s,nR>a�s,ay.E W/ YELLOW I ll 1--Nne.-.:z,-s CAP 136 > .26 CONVERT TO CONTROL: ua-• 1 TYPE 0' CENTER SEC 27-84-24 1z 1:!by 31 'B -.I 6 3 .�L.e,- �,n :. BEGIN ENb CROSSING ;'4" REBAR W/YELLOW CAP #8136 '� _ / N=3754.32, E=4645.13, ELEV.=127.OS CURB _ SW CORNER,L OT 9 KARL CL ARK'S SUB JULo w2003 A YA' REBAR W YELLOW CAP 6586 J I iN=4139.24, E=4978.85, ELEV.=121.16 ....e+..n I c t��I p 1� -_-� F R. D ALL URUTIES ARE ONLY GENERALLY LOCATED. CITY OF AM ES, 10WA SCALE COMPACTOR IS RESPONSIBLE FOR LOCATING CTI EXPOStING ALL DEPT. OF PLANNING & HORSING 9.- CONSTRUCTION THAT MAY INTERFERE WITH CONSTRUCTION BEFORE CONSTRUCTION BEGINS. 0 SO 100 DATE REVISION I BY GATE MASTER PLAN DESIGNED: JMG 5/0-3FOX Engineering Asaoclates, Inc. KINYON - CLARK SUBDIVISION 1501 GAd.n Am-Drl..,S.H.103 PROJECT NO. DRAWN: I SRS 5/03 KINYON k CLARK PROPERTIES A.mw.10"50010 FRIEDRICH DEVELOPMENT CORPORATION .n 9 I n..r I n 9 PFAX: $15 233-0103 CHECKED: 4R 6/03 AMES, IOWA FAX: SIS T33-0103 5180-038 LAST UPDATE: 7/7/03