Loading...
HomeMy WebLinkAboutA005 - Council Action Summary from December 5, 2000 meeting CO UNCIL ACTION S UMMARY Meeting Date: 12105100 Agenda Item #: Comments SUBJECT: Letter from Hunziker S&Associates dated December 5, 2000, Requesting Reconsideration of the Developer's Requirement to Eliminate the Cul-de-sac known as Preston Circle (Uthe Subdivision) ACTION TAKEN: Referred to staff and tabled third passage of ordinance rezoning Uthe Farm until December 19, 2000. MOTION BY: Goodhue SECOND BY: Cross VOTING AYE: Campbell, Cross, Goodhue, Hoffman, Quirmbach, Wirth VOTING NAY: None ABSENT: None Diane Voss, City Cleric Copy to: Brian P. O'Connell !,a -00 c.a q1.90#41 SSOCIATES, REALTORSO 105 South 16th Street Ames,Iowa 50010-8009 (515)233-4450•FAX(515)232-5521 email:hunzikerRE@aol.com December 5, 2000 Mayor and City Council of Ames 515 Clark Ave. Ames, IA 50010 Dear Mayor and City Council members, The Developers of the Uthe Farm respectfully request the council to reconsider it's decision to require the Developers to eliminate the cul-de-sac know as Preston Circle. Attached are the additional infrastructure costs associated with making Preston Circle a through street. In addition to the cost of the infrastructure the Developers either will lose a standard size lot or they will end up with smaller lots mixed in to achieve the same total number of lots. By making the street go all the way through, the City is creating two more corner lots and reducing the value of the nine interior lots on the cul-de-sac. The corner lots are typically always the last lots to sell in the subdivisions. The lots on the cul-de-sacs sell first and sell for more money. The additional right of way for the street alone is over 15,000 square feet. That is more area than the largest lot in the subdivision. Infrastructure cost difference(see attached) $ 51,748.00 Loss of one lot (typical lot price for Northridge 18th) $ 50,000.00 Reduction of value to lots on the cul-de-sac (9 lots x $3,000) $ 27,000.00 Reduction of value on the corner lots (2 lots x $5,000) $ 10,000.00 Total cost to the developer $138,748.00 One of the arguments by the City staff is that snow removal is difficult on the cul-de- sacs. The Developers would agree to have the home owners association pay for the snow removal on Preston Circle. Another argument is that it forces all of the traffic one way. I have a hard time believing that 5 to 8 single family homes can truly impact traffic flows. Res ectfully submitted, 6L&4� Chuck Winkleblack Sent By: WNHKS & CO. AMES,IA; 515 663 9998; Nov-30-00 12:10PM; Page 2/2 N , UTHE FARMS Prei(- Plat Preston Circle Infrastructure Cost Comparison Prepared by WHKS 8 Co. --- -- -.. for Friedrich Land Development Company/ Hunziker Land Development Company P y -- November 30,2000 i Item - _.----_ -----.'._ Units Quantity Unit Cost 1 Extended Cost Cul-De-Sac .Curb and Gutter L.F. - 1050 $15.00 $15,750.00 1Street Pavement S.Y. 1700 - $18.00 $30,600.00 Sidewalk -- -- S.F. 4200_ $2.00— $8,400.00 - _ — 12"Storm Sewer _ _..___..._..._-..'_ - L.F. -- _.26 $33.00. — $858.00 Subdrain L.F. 430 $20.00 $8,600.00 Storm Sewer Intake — -EA. 2-- $1,200.00 -$2,400.00 8"Sanitary Sewer _- -- - T L.F. --430 _ $35.00 $15,050.00 Sanitary Manhole EA. _ _ 1 $2,500.00 $2,500.00 8"Water Main L.F. 800 $18.00 $14,400.00 -- - ---- —._.. -. $98,558.00 Throw h Street _ 'Curb and Gutter L.F. 1590 $15.00 $23,850.00 Street Pavement-. _ S.Y. ~2390 $18.00 $43 020.00 Sidewalk --S.F. 6360 _ —$2.06 $12,720.00 _- -.._._..__._ . _E 12" Storm Sewer L.F. 452 _ $33.00 $14,916.00 i Subdrain - — L.F. 320 $20.00 $6,400.00 Storm Sewer Intake ----- -- EA __.. —_. . 4 _ $1,200.00 $4 800.00 8"Sanitary Sewer L.F. 720 $35.00 $25,200.00 Sanitary Manhole EA 2 $2,500.00 $5,000.00 8"Water Main -- L.F. 800 $18 00 $14,400.00 _ $150,306.00 Additional Infrastructure Required for Through Street Curb and Gutter L.F. 9; 0 ' $15 00 _$8,100 00 Street Pavement —— — S.Y. — 690 $98.00 $92,420.00 _... ;Sidewalk S.F. 2160 $2 00 $4,320 00 12-Storm Sewer - L.F. 4266 $33 00 $14,05800 Subdrain L.F. -110 $20.00 -$2,200.00 Storm Sewer Intake EA. 2 $1,200.00 $2,400.00 8" Sanitary Sewer L.F. 290 $35.00 $10,150.00 Sanitary Manhole _ ....._..---.....__ _.. — EA...— _.__.1..._.____. - $2,500.00 $2,500.00 8"Water Main --_ -- —. L.F. 0 $18.00 $0.00 $51,748.00 579307preston circle infrastructure comparison.xls 11/30/00, 11.52 AM