Loading...
HomeMy WebLinkAboutA001 - Council Action Form dated July 25, 1995 ITEM #: Q5 DATE: 07/25/95 COUNCIL ACTION FORM SUBJECT: PUBLIC HEARING TO CONSIDER AN ORDINANCE TO AMEND THE FLOOD PLAIN REGULATIONS OF THE CITY TO BRING THEM INTO COMPLIANCE WITH THE NFIP STANDARDS ACTION FORM SUMMARY: These proposed changes to the flood plain regulations of the City have been requested by FEMA to meet the National Flood Insurance Program standards. The Planning and Zoning Commission and staff recommend approval of these additions and changes to the Flood Plain Ordinance of the City. BACKGROUND: In November of 1994, an assessment of the City was made by an official from the Federal Emergency Management Agency (FEMA) for compliance with the National Flood Insurance Program guidelines and requirements. As part of that assessment it was noted by The FEMA officials that some changes needed to be made to the Flood Plain Regulations of the City to meet the NFIP standards that were revised in 1986. These changes include a subsection on new and substantially improved structures that was inadvertently deleted from the Floodway Fringe (Overlay) District Regulations, Section 9.5, in 1992 a new subsection for the Floodway Fringe (Overlay) District, dealing with recreational vehicles: and the addition of a number of definitions that are currently not in the Flood Plain regulations or that need to be changed. ANALYSIS: The following addition should be made to Section 9.5 (2) of the Flood Plain Zoning Regulations. This subsection was inadvertently left out of this section when an ordinance change was made to this section in 1992. Section 9.5(2)( ). All new and substantially improved structures: (i) Fully enclosed areas below the "lowest floor" (not including basements) that are subject to flooding shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a registered professional engineer or meet or exceed the following minimum criteria: (a) A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. (b) The bottom of all openings shall be no higher than one foot above grade. (c) Openings may be equipped with screens, louvers, valves, or other coverings or devices provided that they permit the automatic entry and exit of floodwaters. (ii) New and substantially improved structures must be designed (or modified) and adequately anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. (iii) New and substantially improved structures must be constructed with electrical, heating. ventilation, plumbing, and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. The Floodplain Zoning Regulations currently do not address recreational vehicles in the floodplain. This proposed new subsection in Section 9.5 (2), dealing with recreational vehicles, is required by the revised NFIP standards adopted in 1986. Section 9.5(2)( ) Recreational vehicles. Recreational vehicles placed on sites within Zones Al-30, AH, and AE on the community's FIRM shall either: (i) Be on the site for fewer than 180 consecutive days and be fully licensed and ready for highway use, or (ii) Meet the permit, elevation and anchoring requirements for "manufactured homes". A recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by disconnect type utilities and security devices, and has no permanent attached additions. The FEMA officials requested that many definitions be added or modified in Section 9.11 of the Flood Plain Zoning Regulations. All the definitions proposed for Section 9.11 are listed below, including those that do not have to be changed. This is being done for purposes of continuity. There is a note after each definition, indicating whether it is an unchanged definition or a new definition. 2 Section 9.11 DEFINITIONS. Unless specifically defined below, words or phases in this ordinance shall be interpreted so as to give the meaning they have in common usage and to give this ordinance its most reasonable application. (1) Appeal. A request for review of the Building Official's interpretation of any provision of this ordinance or request for a variance. [New definition] (2) Area of Shallow Flooding. A designated AO or AH zone on a community's Flood Insurance Rate Map (FIRM) with a one percent or greater annual chance of flooding to an average depth of one to three feet where a clearly defined channel is unpredictable and sheer velocity flow may be evident. Such flooding is characterized by ponding or sheet flow. [New definition] (3) Base Flood. The flood having a one percent chance of being equalled or exceeded in any given year for a given area. [Unchanged definition] (4) Base Flood Elevation (BFE). The height to which the base flood is estimated to rise. [Unchanged definition] (5) Basement. Any area of the building having its floor subgrade (below ground level) on all sides. [New definition] (6) Development. Any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations or storage of equipment or materials. [New definition] (7) Existing Construction. Structures for which the "start of construction" commenced before the effective date of the initial FIRM (January 1, 1981). "Existing construction" may also be referred to as "existing structures". [Unchanged definition] (8) Existing Factory-built Home Park or Subdivision. A factory-built home park or subdivision for which the construction of facilities for servicing the lots on which the factory-built homes are to affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is complete before the effective date of the floodplain management regulations adopted by the community. [New definition] (9) Factory-built Home. A structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when attached to the required utilities. The term "manufactured home" does not include a "recreational vehicle". [New definition] 3 (10) Factory-built Home Park or Subdivision. A parcel (or continuous parcels) of land divided into two or more factory-built home lots for rent or sale. [New definition] (11) Flood or Flooding. A general and temporary condition of partial or complete inundation of normally dry land areas from: (a) the overflow of inland or tidal waters; (b) the usual and rapid accumulation of runoff of surface waters from any source. [New definition] (12) Flood Fringe. That area of the floodplain, outside the floodway, that on the average is likely to be flooded once every 100 years (i.e., that has a one percent chance of flood occurrence in any one year). [New definition] (13) Flood Insurance Rate Map (FIRM). An official map of a community, on which the Flood Insurance Study has delineated the Flood Hazard Boundaries and the zones establishing insurance rates applicable to the community. [New definition] (14) Flood Insurance Study. The official report provided by the Federal Emergency Management Agency. The report contains flood profiles, as well as the Flood Boundary Map and the water surface elevation of the base flood. [Unchanged definition] (15) Floodplain. Any land area susceptible to being inundated by water from any source (see definition of flooding). [New definition] (16) Flood Proofing. A combination of structural provisions, changes, or adjustment to properties and structures subject to flooding primarily for the reduction or elimination of flood damages to properties, water and sanitary facilities, structures, and contents of buildings in a flood hazard area. [Unchanged definition] (17) Floodway or Regulatory Floodway. The channel of the river or watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one tenth (.1) foot. [New definition] (18) Floodwav Fringe. Those portions of the floodplain, other than the floodway, which can be filled, levied, or otherwise obstructed without causing substantially higher flood levels or flow velocities. [Unchanged definition] (19) Freeboard. A factor of safety usually expressed in feet above a flood level for purposes of floodplain management. "Freeboard tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action, clogged bridge openings, and the hydrological effect of urbanization of the water shed. [New definition] 4 (20) General Flood Plain. Area of the floodway fringe and the floodway combined. [Unchanged definition] (21) Highest Adjacent Grade. The highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure. [New definition] (22) Historic Structure. Any structure that is: (a) Listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; (b) Certified or preliminarily determined by the Secretary of Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as registered historic district; (c) Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of the Interior; or (d) Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either: (1) By either an approved state program as determined by the Secretary of the Interior or (2) Directly by the Secretary of the Interior in states without approved programs. [New definition] (23) Lowest Floor. The lowest floor of the lowest enclosed area (including basement). An unfinished or flood- resistant enclosure, usable solely for parking of vehicles, building access or storage, in an area other than a basement area, is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of the applicable non-elevation design requirements of this ordinance. [New definition] (24) New Construction. For floodplain management purposes, "new construction" means structures for which the start of construction commenced on or after the effective date of the floodplain management regulation adopted by a community and includes any subsequent improvements to such structure. [New definition] (25) Overlay District. It is a district in which additional requirements act in conjunction with the underlying zoning district(s). [New definition] (26) Principally Above Ground. Principally above ground means that at least 51 percent of the cash value of the structure is above ground. [New definition] (26) Recreational Vehicle. A vehicle which is (a) built on a chassis; (b) 400 square feet or less when measured at the largest horizontal projections; (c) designed to be self propelled or permanently towable by a light duty truck; and (d) designed primarily not for use as a permanent dwelling but as temporary quarters for recreational, camping travel or seasonal use. [New definition] 5 (27) Special Flood Hazard Area. The land in the Floodplain within a community subject to one percent or greater chance of flooding in any given year. [New definition] (28) Start of Construction. [for other than new construction or substantial improvements under the coastal Barrier Resources Act (Pub. L. 97-348)] It includes substantial improvement, and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement , or other improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of a structure on a site, such as the poring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; not does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; not does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not the alteration affects the external dimensions of the building. [New definition] (29) Structure. Anything constructed or erected, on the ground, or attached to the ground including, but without limiting the generality of the foregoing: buildings, factories, sheds, cabins, mobile homes, manufactured homes, other similar items, and walled and roofed buildings, including gas or liquid storage tanks that are principally above ground. [Unchanged definition] (30) Substantial Damage. Damage of any origin sustained by a structure whereby the cost of restoring the structure to its condition before the damage occurred would equal or exceed 50 percent of the market value of the structure before the damage occurred. [Unchanged definition] (31) Substantial Improvement. Any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds 50 percent of the market value of the structure before the "start of construction" of the improvement. This term includes structures which incurred "substantial damage" regardless of the actual repair work performed. The term does not, however, include either (1) any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications which have been identified by the local code enforcement official and which are the minimum necessary to assure safe living conditions, or (2) any alteration necessary to the structure's continued designation as a "historic structure". [Unchanged definition] 6 (32) Variance. A grant of relief to a person from the requirements of this ordinance which permits construction in a manner otherwise prohibited by this ordinance where specific enforcement would result in unnecessary hardship. [New definition] The Planning and Zoning Commission reviewed this request at their meeting of June 21, 1995, and recommended that these amendments be approved. ALTERNATIVES: 1. The City Council can approve the amendments to the City Council that the Flood Plain Regulations as proposed above. 2. The City Council can deny approval of the amendments to the City Council that the Flood Plain Regulations, as proposed above. 3. The City Council can table this request for additional information from staff. MANAGER'S RECOMMENDATION: It is the recommendation of the City Manager that the proposed changes to the Flood Plain Regulations be approved to bring them into compliance with National Flood Insurance Program. Attachment h\bpokaf\f1ood.725 7 ORDINANCE NO. AN ORDINANCE TO AMEND THE MUNICIPAL CODE OF THE CITY OF AMES, IOWA, BY ADDING NEW SUBSECTIONS 9.5(2)(k) and 95.(2)(1); REPEALING SECTION 9.11 AND RE-ADOPTING THAT SECTION REVISED; REPEALING ANY AND ALL ORDINANCES OR PARTS OF ORDINANCES IN CONFLICT TO THE EXTENT OF SUCH CONFLICT; PROVIDING A PENALTY AND ESTABLISHING AN EFFECTIVE DATE; ALL FOR THE PURPOSE OF ADOPTING CHANGES IN THE FLOOD PLAIN REGULATIONS AS REQUESTED BY THE FEDERAL EMERGENCY MANAGEMENT ADMINISTRATION TO MEET THE NATIONAL FLOOD INSURANCE PROGRAM STANDARDS. BE IT ENACTED, by the City Council for the City of Ames, Iowa: Section One. The Municipal Code of the City of Ames, Iowa shall be and the same is hereby amended by adding new subsections 9.5(2)(k) and 9.5(2)(1) as follows: "(k) For all new and substantially improved structures: (i) Fully enclosed areas below the"lowest floor"(not including basements)that are subject to flooding shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a registered professional engineer or meet or exceed the following minimum criteria: a. A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. b. The bottom of all openings shall be no higher than one foot above grade. C. Openings may be equipped with screens, louvers, valves, or other coverings or devices provided that they permit the automatic entry and exit of floodwaters. (ii) New and substantially improved structures must be designed (or modified) and adequately anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. (iii) New and substantially improved structures must be constructed with electrical,heating,ventilation,plumbing and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. (1) Recreational vehicles placed on sites within zones AI-30,AH,and AE on the Flood Insurance Rate Map (FIRM) established for the City of Ames shall either: (i) Be on the site for fewer than 180 consecutive days and be fully licensed and ready for highway use, or (ii) Meet the permit, elevation and anchoring requirements for "manufactured homes". A recreational vehicle is ready for highway use if it is on its wheels or jacking system; is attached to the site only by disconnect type utilities and security devices, and has no permanent attached additions." Section Two. The Municipal Code of the City of Ames, Iowa shall be and the same is hereby amended by repealing Section 9.11 as it now exists and enacting a new Section 9.11 as follows: "Sec. 9.11. DEFINITIONS. Unless specifically defined below, words or phrases in this chapter shall be interpreted so as to give the meaning they have in common usage and to give this chapter 1 its most reasonable application. (1) Appeal. A request for review of the Building Official's interpretation of any provision of this ordinance or request for a variance. (2) Area of Shallow Flooding. A designated AO or AH zone on a community's Flood Insurance Rate Map(FIRM)with a one percent or greater annual chance of flooding to an average depth of one to three feet where a clearly defined channel is unpredictable and sheer velocity flow may be evident. Such flooding is characterized by ponding or sheet flow. (3) Base Flood. The flood having a one percent chance of being equaled or exceeded in any given year for a given area. (4) Base Flood Elevation (BFE). The height to which the base flood is estimated to rise. (5) Basement. Any area of the building having its floor subgrade(below ground level) on all sides. (6) Development. Any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures,mining, dredging, filling, grading,paving, excavation or drilling operations or storage of equipment or materials. (7) Existing Construction. Structures for which the "start of construction"commenced before the effective date of the initial FIRM (January 1, 1981). "Existing construction" may also be referred to as "existing structures". (8) Existing Factory-built Home Park or Subdivision. A factory-built home park or subdivision for which the construction of facilities for servicing the lots on which the factory-built homes are to be affixed(including, at a minimum,the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is complete before the effective date of the floodplain management regulations adopted by the community. (9) Factory-Built Home. A structure,transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when attached to the required utilities. The term "manufactured home" does not include a"recreational vehicle". (10) Factory-built Home Park or Subdivision. A parcel(or continuous parcels)of land divided into two or more factory-built home lots for rent or sale. (11) Flood or Flooding. A general and temporary condition of partial or complete inundation of normally dry land areas from: (a) the overflow of inland or tidal waters; (b) the usual and rapid accumulation of runoff of surface waters from any source. (12) Flood Fringe. That area of the floodplain,outside the floodway,that on the average is likely to be flooded once every 100 years(i.3. that has a one percent chance of flood occurrence in any one year). (13) Flood Insurance Rate Map (FIRM). An official map of a community, on which the Flood Insurance Study has delineated the Flood Hazard Boundaries and the zones establishing insurance rates applicable to the community. (14) Flood Insurance Study. The official report provided by the Federal Emergency Management Agency. The report contains flood profiles,as well as the Flood Boundary-Floodway Map and the water surface elevation of the base flood. (15) Floodplain. Any land area susceptible to being inundated by water from any source (see definition of flooding). (16) Flood Proofing. A combination of structural provisions,changes,or adjustment to properties and structures subject to flooding primarily for the reduction or elimination of flood damages to properties,water and sanitary facilities, structures, and contents of buildings in a flood hazard area. (17) Floodway or Regulatory Floodway. The channel of the river or watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one tenth (.1) foot. (18) Floodway Fringe. Those portions of the flood plain, other than the floodway, 2 which can be filled, levied, or otherwise obstructed without causing substantially higher flood levels or flow velocities. (19) Freeboard. A factor of safety usually expressed in feet above a flood level for purposes of floodplain management. "Freeboard tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action,clogged bridge openings,and the hydrological effect of urbanization of the water shed. (20) General Flood Plain. Area of the floodway fringe and the floodway combined. (21) Highest Adjacent Grade. The highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure. (22) Historic Structure. Any structure that is: (a) Listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirement for individual listing on the National Register; (b) Certified or preliminarily determined by the Secretary of Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as registered historic district; (c) Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of the Interior; or (d) Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either: (i) By either an approved state program as determined by the Secretary of the Interior or (ii) Directly by the Secretary of the Interior in states without approved programs. (23) Lowest Floor. The lowest floor of the lowest enclosed area(including basement). An unfinished or flood-resistance enclosure, usable solely for parking of vehicles,building access or storage, in an area other than a basement area, is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of the applicable non-elevation design requirements of this ordinance. (24) New Construction. For floodplain management purposes, "new construction" means structures for which the start of construction commenced on or after the effective date of the floodplain management regulation adopted by a community and includes any subsequent improvements to such structure. (25) Overlay District. It is a district in which additional requirements act in conjunction with the underlying zoning district(s). (26) Principally Above Ground. Principally above ground means that at least 51 percent of the cash value of the structure is above ground. (27) Recreational Vehicle. A vehicle which is(a)build on a chassis;(b)400 square feet or less when measured at the largest horizontal projections; (c) designed to be self propelled or permanently towable by a light duty truck; and(d) designed primarily not for use as a permanent dwelling but as temporary quarters for recreational, camping travel or seasonal use. (28) Special Flood Hazard Area. The land in the Floodplain within a community subject to one percent or greater chance of flooding in any given year. (29) Start of Construction. [for other than new construction or substantial improvements under the coastal Barrier Resources Act (Pub. L. 97-348)] It includes substantial improvement, and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement, or other improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of a structure on a site,such as the poring of slab or footings,the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, 3 such as clearing,grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundation or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor,or other structural part of a building,whether or not the alteration affects the external dimensions of the building. (30) Structure. Anything constructed or erected, on the ground, or attached to the ground including,but without limiting the generality of the foregoing: buildings, factories, sheds, cabins, mobile homes,manufactured homes, other similar items, and walled and roofed buildings, including gas or liquid storage tanks that are principally above ground. (31) Substantial Damage. Damage of any origin sustained by a structure whereby the cost of restoring the structure to its condition before the damage occurred would equal or exceed 50 percent of the market value of the structure before the damage occurred. (32) Substantial Improvement. Any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds 50 percent of the market value of the structure before the "start of construction" of the improvement. This term includes structures which have incurred "substantial damage" regardless of the actual repair work performed. The term does not, however, include either (a) any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications which have been identified by the local code enforcement officer and which are the minimum necessary to assure safe living conditions or(b) any alteration necessary to the structure's continued designation as a "historic structure. (33) Variance. A grant of relief to a person from the requirements of this ordinance which permits construction in a manner otherwise prohibited by this ordinance where specific enforcement would result in unnecessary hardship." Section Two. Violation of the provisions of this ordinance shall constitute a municipal infraction punishable as set out in Section 1.9 of the Municipal Code. Section Three. All ordinances or parts of ordinances in conflict herewith are hereby repealed to the extent of such conflict, if any. Section Four. This ordinance shall be in full force and effect from and after its passage and publication as required by law. Passed this day of 1995. Sandra L. Ryan, City Clerk Larry R. Curtis, Mayor 0357 4 � Y M�N Z Federal Emergency Management Agency Region VII y0 o b 911 Walnut Street, Room 300 Kansas City, MO 64106 DEC 21 1994 The Honorable Larry R. Curtis Mayor, City of Ames 515 Clark Avenue P.O. Box 811 Ames, Iowa 50010 Dear Mayor Curtis: On Wednesday, November 9, 1994, Ross Richardson of this office met with City officials (see enclosed attendance record) . The purpose of the meeting was to assess the effectiveness of your community' s floodplain management program in meeting the criteria for participation in the National Flood Insurance Program (NFIP) . Additionally, the visit provided technical assistance to your staff. During the visit the following areas of your program were reviewed. 1. The adequacy of the existing floodplain management ordinances in meeting the provisions for participation in the NFIP, outlined in 44 CFR 60.3 . 2 . The adequacy of existing mapping supplied by the Federal Emergency Management Agency (FEMA) in the form of a Flood Insurance Study (FIS) /Flood Boundary and Floodway Map (FBFM) and a Flood Insurance Rate Map (FIRM) . 3 . The adequacy of an existing floodplain development permit/application and the associated elevation and floodproofing certificates for verifying and recording "as- built" elevations for elevated or floodproofed developments. 4. The adequacy of written administrative procedures for the issuing, tracking and recording of the above permit/ certification process. 5. All floodplain development permits, permits for new or substantially improved structures and associated "as built" certificates that have been issued in the past year. This review included any variances that have been issued in the same time period. 6. The procedures followed for the enforcement of floodway provisions of the NFIP and those other provisions dealing with watercourse alterations or maintenance of carrying capacity. 7. The conformance of variance procedures to FEMA guidelines. 8. The review of the last Biennial Report submitted to this office. 9. A review of the "Buyout" program under DR-0996-IA. Based on the results of our review, the following assessment and time frame for corrective action is provided. 1. On October 1, 1986, the NFIP standards were revised requiring participating communities to update their floodplain management regulations. The FEMA Regional Office has approved your community' s Floodplain Management Ordinance Number 3176 which was passed on June 1, 1992. However, at this time, a revision is necessary to comply with NFIP standards. The City must -amend its floodplain management regulations with the enclosed definition section. Please add those definitions into Section 9 .11 which currently do not appear. Somehow, Section 9.5 (2) (d) which was adopted in Ordinance Number 2979 on May 26, 1987 was omitted when the above referenced Ordinance Number 3176 was passed. Therefore, the City must amend its floodplain management regulations to include the enclosed subpart (d) . In addition, the following "recreational vehicle" text must be placed in Section 9.5 : "Require that recreational vehicles placed on sites within Zones Al-30, AH and AE on the community' s FIRM either: 1 . Be on the site for fewer than 180 consecutive days. 2 . Be fully licensed and ready for highway use, or 3 . Meet the permit, elevation and anchoring requirements for "manufactured homes" . A recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by disconnect type utilities and security devices, and has no permanent attached additions. " 2 2 . The FIRM and FBFM were reviewed and found to reflect current potential flooding conditions. However, the City has annexed several areas but is implementing the Story County---maps for floodplain management purposes. The new City map will be submitted to our National Office for their files to consider if a map revision is justified in the future. 3 . The Floodplain Development Permit/Application was found to be acceptable for floodplain development . The FEMA Elevation/Floodproofing Certificates are used for floodplain development. 4. The administrative procedures are adequate for issuing, tracking and recording of the above process. S. Floodplain Development Permits issued during the last calendar year were reviewed. In a conversation with the Iowa Department of Natural Resources (IDNR) , they confirmed that a State floodplain development permit was issued to the Iowa Department of Transportation (IDOT) for the new Dayton Road overpass at Highway 30. This permit is acceptable for *local floodplain management purposes, in accordance with the IDOT/IDNR Memorandum of Understanding and IDOT' s policies and procedures manual. The following eight structures, which have been permitted by the City, requires elevation certificates: a. 1521 East Lincoln Way. b. 416 Grandwood. c. 538 South Duff Avenue. d. 808 East Lincoln'Way. e. 215 Freel Drive. f. 811 South Duff Avenue. g. 1400 South Dayton Avenue. h. 1006 South Dayton Avenue, Lot 45 . Of the approximate 50 substantially damaged structures in the 111993 Flood" , fifteen structures are awaiting the FEMA buyout programs, thirty-four trailers have been removed and one commercial structure will not be reoccupied. The City did notify property owners of flood damaged structures so that they would know that the buildings were damaged and required floodplain development permits . 3 The appropriate permits were.. issued by the City with the exception of three structures on South Maple Street (445 South Maple and a woodcutters shack and trailer on same lot) . The City is required to provide the status of the three structures on South Maple Street, the eight elevation certificates and a report on a quarterly basis until documentation on all fifteen structures is provided to our office. 6. The City has had problems with illegal filling in the Squaw Creek floodway. The City has been monitoring this activity and has demonstrated that most of these problems have been resolved. In the unresolved case, the City must provide documentation to our office to demonstrate that the materials stored at 811 South Duff Avenue have been removed from the floodway. The City has adopted a more restrictive floodway which was provided by the Rock Island Corps of Engineers. Our office encourages communities to exceed NFIP minimum standards and this type of regulatory tool will assist in. reducing future flood losses. If changes are made to this requirement, please inform our office. 7 . The variance procedures were reviewed and meet FEMA guidelines for handling variance requests that may be presented for' floodplain development. 8 . The 1993 Biennial Report was reviewed and found to be in order. 9. The "Buyout" Programs are being administered by the City' s Department of Planning and Housing. FEMA 404 Hazard Mitigation funds have been approved to purchase twenty-six structures . The City has applied for the Section 1362 program, a part of the NFIP, for the purchase of the Arcadia Lodge. The application is pending awaiting a decision from the City on the status of this structure. In summary, you are reminded that to continue participation in good standing in the NFIP, the following ACTION ITEMS must be submitted on or before the DUE DATE. These are keyed to the number in the aforementioned review. 4 ACTION ITEM DUE DATE 1. Amend the Floodplain July 3, 1995 Management Ordinance. 2 . NONE 2 3 . NONE 400 4. NONE - IS' S. Provide 8 elevation certificates. April 3, 1995 Provide quarterly report on April 3, 1995 the status the 15 flood damaged properties. Provide status of structures on April 3, 1995 South Maple Street. 6. Provide documentation of floodway April 3, 1995 removal at 811 S. Duff Avenue. 7 . NONE 8. NONE 9 . NONE If assistance is needed during the above time frame, Ross Richardson at (816) 283-7005 will be able to assist you. Sincerely, 2gAA� Stephen R. Harrell, Director Mitigation Division Enclosures CC : Jeff Pearson, Building Official w/enclosures Brian O'Connell, Planning Director w/enclosures Bill Cappuccio, NFIP State Coordinator Ross Richardson, CCO 5