Loading...
HomeMy WebLinkAboutA002 - Request for Siting approval of Sanitary Disposal Project June 7, 1990 William K. Fedeler Ames Trenching, Inc. 1509 E. Lincoln Way Ames, IA 50010 City of Ames City Hall Ames, Iowa 50010 RE: REQUEST FOR SITING APPROVAL OF SANITARY DISPOSAL PROJECT Honorable Mayor & City Council: In accordance with revisions to Chapter 455B. 305A of the Iowa Code enacted by the General Assembly and signed by the Governor on April 24 , 1990 effective as law upon approval of the Governor, I, Mr. William K. Fedeler, hereinafter referred to as the Applicant, d.b.a. Ames-Story Environmental Landfill, Inc. , 1509 E. Lincoln Way, Ames, Iowa 50010 do hereby request approval from the Ames City Council to construct and operate a Sanitary Disposal Project within the Corporate Limits of the City of Ames. The proposed site for the sanitary landfill is Lot 3 , Dayton Road Development Subdivision, Watts Street, Ames, Iowa, 50010. Plans for the landfill are being developed by Clapsaddle-Garber Associates, Inc. , Ames, Iowa to serve as the basis for an Application to the Iowa Department of Natural Resources for a Permit to Operate a Sanitary Disposal Project in accordance with Iowa Administrative Code Chapter 567-102 . With reference to Section 1 . 2 of the new law, the following comments are offered: a. The project is necessary to accommodate the solid waste management needs of the area by providing a disposal site restricted to the following items - Construction and demolition wastes - Diseased trees and tree stumps which cannot be chipped, land applied or composted - Hydrocarbon contaminated soil to be treated on-site, tested, and reclaimed in accordance with IDNR requirements - Asbestos for which an IDNR Special Waste Authorization has been issued b. The project is designed, located, and proposed to be operated in accordance with IDNR standards so that the public health, safety, and welfare will be protected. C. The project is located immediately adjacent to the existing City of Ames landfill in an area zoned G1 - General Industrial so as to minimize incompatibility with the character of the surrounding area and to minimize the effect of the value of the surrounding property. d. The project is located outside the 100-year flood plain of the South Skunk River. e. The plan of operations for the project is designed to minimize the danger to the surrounding area from fire, spills, or other operational accidents. f. Utilizing the same access as the existing City of Ames landfill, traffic patterns to and from the project shall minimize the impact on exiting traffic patterns. Written notice has been issued to all property owners within 1, 000 feet of the project site and members of the general assembly from the legislative district in which the proposed project is located. Notice will also been published in the Ames Tribune (affidavit of publication attached) . The law requires a 90-day comment period prior to a public hearing, and that written comments received within 30 days after the public hearing be considered prior to the City Council issuing its decision. However, since the Ames City landfill will no longer accept construction and demolition wastes by mid-summer, the Applicant requests that for the convenience of residents, contractors, and businesses the City and State Legislators use what means are available to hold the public hearing within 30 days of published notice and that the Council's decision be considered immediately following the hearing. Thank you for your immediate consideration of this request. If the Mayor, Council or City staff have questions or if additional information is needed, contact Leslie S. Wolfe, CGA (296-7750) or myself at 232-6837 . Very truly yours, Ames-Story Environmental Landfill, Inc. - �2 � William K. Fedeler