HomeMy WebLinkAboutA001 - proof of publication, June 29, 1982 LEGAL NOTICE (5) Minimum Bill. The minimum monthly bill shall be ORDINANCE NO. 2B27 the highest demand charge in AN ORDINANCE TO' the current or preceding eleven ESTABLISH A NEW ELEC- '01) months. Proof of Publication in The TRICAL UTILITY RATE (6) Power Factor Adjustment. CLASSIFICATION FOR - be mad , at othe adjustment ofmay the AMES DAILY TRIBUNE MANUFACTURING- be made, at the option of the PROCESSING TYPE IN- utility,when the power factor at DUSTRIAL CUSTOMERS the time of maximum monthly WITH 'EXTREMELY HIGH demand is less than 85 percent DEMAND FOR AND CON- lagging. If the power factor is SUMPTION OF ELECTRICAL Mess than 85 percent, the billing STATE OF IOWA, STORY COUNTY, SS. ENERGY; AND ESTAB- demand may be increased as LISHING EFFECTIVE DATES follows: (85 percent minus BE IT ENACTED,by the City measured power factor) times Council of the City of Ames, A1.5 times (current month I xc�SOXC.Sv)C { )k�f}r�4R4dK Robert J. Iowa: measured demand). Jacobsen, on oath depose and say that I am Section One. For the purpose -t77" Credit for Customer- of establishing a new electric gowned Substation. The total )rm-:p [Xj;tbg , production foreman of the AMES utility rate classification the biding for demand charge and DAILY TRIBUNE, a daily newspaper, printed at Municipal Code of the City of ,energy charge shall be reduced Ames, Iowa, shall be and is by five percent (5 i)as a credit Ames, Story County, Iowa;that the annexed printed hereby amended by adding for a customer-owned and thereto a new section 28.5.1 as ,maintained substation. City of Ames — Ordinance 4 2827 follows: (8) Excessive Facility "Sec. 28.5.1 INDUSTRIAL Charge. In the event service RATE facilities in addition to, or dif- (1)Availability: Provisions of "Fefent from, a standard in- Sec. 28.5 notwithstanding, stallation are requested by the electrical energy and service customer, or are required to shall be available at the ;serve the customer's load, the was published in said newspaper for 1 following "industrial rate" to city shall furnish, install, and manufacturing-processing type maintain such facilities subject consecutive weeks,the first 14mftstrial customers receiving ,to the following considerations: monthly service of not less than (a) The type, extent, and and the last of said publication was on the 2,500 Kw billing demand and location of such service a 600,000 Kwh-month con- facilities shall be deter- 29th day of Tlinp sumption. Service shall be at mined by agreement bet- 13,800 volts or higher. The ween the city and the 19$� customer shall furnish all customer. transformation for utilization (b) Such service facilities — equipment. The rate provided shall be the property of the for in this section shall be in full ; City of Ames Electric Sworn to before me an s scribed in my presence force and effect on and after the Utility. b �� first day of July, 1982, through (c) The customer shall pay y ifjiXD�A{6&)!3C)�CO¢�XCdK Robert J. and including the 30th day of a monthly rental charge on Jacobsen. September, 1982. On and after those facilities in excess of the first day of October, 1982, the facilities included in a this ZSt day of July w (;ustomers who had been on this standard installation. ��{ l * section's rate shall either If the optional or non- 1 standard tJ�L receive service at the.Large standard facilities are used r„((11//// w Power Rate provided for in for other customers also,the �/ i NOtary Public a section 28.5 of the Ames a rental payable by the in and for Municipal Code, or such other customer shall be that Story County. rate as may then be in effect and portion of the total rental 56 94 applicable. which is reasonably Fees,$ • (2) Rate Per Month. A assignable to the customer. customer receiving service (9) Conditions. The industrial under the rates of this section rate shall be subject to the shall be charged, for each JOLLowing specific conditions. monthly billing period, a (a) The customer's total demand charge of$2.77 per Kw usage on a single premise for all kilowatts of billing „ shall determine whether the demand;and,an energy charge customer qualifies for (c') Customer shall furnish of 3.162 cents per Kwh for the service under this rate .,first 100,000 Kwh,2.885 cents per + structure. In no event shall and maintain all equipment Kwh' for the next 400,000 Kwh, the customer be billed on and transformation for and 2.4695 cents per Kwh over both large power and in- R utilization from the con- 500;000'Kwh. dustrial rates. A premise is riettion point on the Utilities (3) Fuel Adjustment,Primary defined as an industrial 13,800 volt system. Service Credit. All charges as establishment and shall M Section Two. This ordinance 'aforesaid shall be subject to the include outlying or adjacent shall be in full force and effect current applicable fuel ad- buildings used by the same from and after its passage and iustment charge as provided for provided the use of service ypublication as required by law. in section 28.2 of the Municipal k in the outlying buildings is Passed this 15th day of June, °Code; and, a five percent (5 i) supplemental and similar to 1982. "credit for primary service. ,the service used in the main (4) Billing Demand. ' buildings. "Demand', for the purpose of (b) Fluctuating loads. If use Mary Atherly, billing, shall be the greater of: of energy is intermittent or Mayor Pro Tern (a) The peak fifteen (15) subject to violent fluc- Gina Bi ro e, minute demand measured tuation, the utility may add City Clerk during the current monthly to the 15-minute measured Published in The Ames Dail billing period,or demand an amount equal to y M1 (b) Fifty percent (50i) of 65 percent of the rated Tribune, June 29, 1982. the peak demand measured ' capacity in Kw of apparatus during the preceding eleven which causes such fluc- (11) months. Wations. (c) provided, however, that the'demand'used for billing shall in no case be less than 2.500 Kw.