Loading...
HomeMy WebLinkAboutA023 - Drawing of Pyle alternative alignments t CROPUNE (1YP) _ 1 1 r � 1 1 \1 1 LIME 1 ' ` I PROPOSED 30"RAW WATER MAIN f 1 SOUTH tem BRIDGE I / 75'SOUTH 16TF}-BORE , —— —— —----- — -SOUTH 1- STREET+T b — _ ) 1 4T , i �. N `yc 1----PROPOSED ROUTE _ I ,- \ tam► ' `FLODOWM (rYp 432'HIGHWAY 30 BORE AND CASING Ali— kill. ft'o HIGHWAY 30 \ \ HIGHWAY 7G BRIDGES (2) 1. 300'SOUTH RIVER CROSSING PARCEL LINE (T'P) '- BEGIN MAIN NAMNIA r AMFs., c+tt OF - F. I 'XFOXFOX Engineering Associates,Inc- PYLE ALTERNATIVE ALIGNMENTS FIGURE. 7A 1601 Golden Aspen Drive,Suite 103 Raw Well water Transmission Pipeline - Ames,Iowa 50010 REVISION N0. DATE �y(•T(R i hI e(,;n LI,,1 Phone:(515)233-0000 City of Ames FAX: (515)233-0103 Story co�n+y. IA nRAWN pRGJEC ND. wTE 3338-OVA 3 1� D8 FOX Engineering Associates, Inc. Memo To: Christina Murphy,P.E.,Assistant Director From: Leslie S.Wolfe,P.E. Date: March 17,2008 Re: Alternate Routes for Pyle Land,LLC Attached is Figure 7A illustrating the preferred route for the raw well water transmission pipeline and two alternate routes: Altemate A-1 west of the Skunk River and Alternate A-2 following the crop line on the west edge of Pyle Land LLC. Cost differentials for the two alternate routes have been estimated as follows: Alternate Route A-1: West of Skunk River Estimated 2008/09 Proiect Cost Differential 30-inch Water Main -22'@$ 100= ($ 2,200) 30-inch Fittings + 2 @$7,000= $ 14,000 River Crossing -20'@$ 450= ($ 9,000) Highway Crossing -77'@$ 600= ($46,200) Design,Admin.&Contgency -22'@$ 49= ($ 1,078) Easements—Two(2)additional parcels Permanent +12,680 SF @$1.00= $12,680 Temporary +27,126 SF @$0.20= 5,425 Total Estimated 2008/09 Project Cost Differential ($26,373) Future Estimated Cost Differential(2008 Dollars) 30-inch Water Main +650'@$ 100= $ 65,000 River Crossing +300'@$ 450= $135,000 Design,Admin.&Contgency +650'@$ 49= $ 31,850 Easements—Temporary +17,424 SF @$0.20 3,485 Total Estimated Future Project Cost Differential $235,335 Net Cost Differential(008 Dollars)—Alternate A-1 $208,962 Page 1 of 2 Memo Re: Alternate Routes for Pyle Land,LLC Y Alternate A-2: West Edge of Pyle Land LLC Estimated 2008/09 Project Cost Differential 30-inch Water Main +339'@$100= $ 33,900 30-inch Fittings + 4 @$7000= $ 28,000 Design,Admin.&Contgency +339'@$ 49= $ 16,611 Easements Permanent + 6,380 SF @$1.00= $ 6,380 Temporary +19,425 SF @$0.20= 3.88 Total Estimated 2008/09 Project Cost Differential $ 88,776 Future Estimated Cost Differential $ 0 Net Cost Differential(2008 Dollars)—Alternate A-2 $ 88,776 Other additional costs to be considered should the route be altered include: 1. Wetlands determination 2. Geotechnical investigations 3. Public Hearing 4. Easement Plats Page 2 of 2